-MEASURED ELECTRIC TRIM BRACKETS TO PANEL & CHANGED AS REQUIRED DUE TO MIRROR IMAGE ISSUES WITH THE PLANS
-DRILLED BRACKETS TO PANEL

-ROLLED RH ELEVATOR LEADING EDGE
-FITTED RH ELEVATOR TO HORIZ STAB & REMOVED REQUIRED MATERIAL
TOTAL PROJECT RIVETS – INST 2137 – REM 42
Manual Reference:
Hours: 4
Total Hours: 196.25
Prev post
LH ELEVATOR RIVETING
Next post
TRIM TAB CONSTRUCTION
Taran
Related Posts
- 12 years ago
- 12 years ago
- 12 years ago
- 12 years ago



