LH ELEVATOR RIVETING

-CUT OFF ELEVATOR TRIM OPENING TABS & FABRICATED RIB (SEE MOD-001)


-RIVETED 703 TO 704


-RIVETED PLATENUTS/ REINFORCEMENT PLATES TO SPAR
-RIVETED 705 ROOT RIB TO SPAR


-RIVETED 703/4 ASSY TO SPAR


-RIVETED SKIN TO 713 COUNTERBALANCE SKIN
-INSERTED SKELETON INTO THE SKIN
-RIVETED SKIN TO SKELETON
-RIVETED LOWER FLANGE OF TAB SPAR

RIVETS – INST 175 – REM 3
TOTAL PROJECT RIVETS – INST 2137 – REM 42

Manual Reference:

Hours: 4

Total Hours: 192.25

Taran

Back to top