TRIM TAB CONSTRUCTION

-REMOVED TAB MATERIAL FROM ELEVATOR TRIM TAB & FABRICATED RIBS TO REPLACE (SEE MOD-001)


-CLAMPED HORNS 618 & 616 TOGETHER & MATCH DRILLED TO SKIN


-MEASURED & CLAMPED HINGE TO TAB


-MATCH DRILLED LOWER SPAR FLANGE TO SKIN
-MATCH DRILLED HINGE/SKIN TO UPPER SPAR FLANGE

TOTAL PROJECT RIVETS – INST 2137 – REM 42

Manual Reference:

Hours: 3

Total Hours: 199.25

Taran

Back to top