LH ELEVATOR FITTING TO STAB

-ROLLED LH ELEVATOR LEADING EDGE & RIVETED


-INSTALLED ROD END BEARINGS PER PLANS
-MADE SLIGHT BEND IN TRIM TAB SKIN AS PER PLANS FOR CLEARANCE
-TEMP FITTED TO HORIZONTAL STAB & STARTED TRIMMING REQD MATERIAL FOR FIT

***LH ELEVATOR COMPLETE***

TOTAL PROJECT RIVETS – INST 2215 – REM 49

Manual Reference:

Hours: 2.5

Total Hours: 211.75

Taran

Back to top