Month: February 2023

Finishing Firewall

Finishing Firewall

-Continued firewall riveting -Riveted all brackets on -Tidied up some bucking bar damage on 601j brackets and touched up with alodine pen -Apart from rivets for cutout to be done later the firewall is done     Manual Reference: 7-11 Installed Removed…

Firewall RHS Riveting

Firewall RHS Riveting

-Built a quick cradle to hold the firewall and make it easier to work on -Riveted Right hand side of firewall together Manual Reference: 7-11 Installed Removed Rivets Today 70 2 Wing Rivets 3387 73 Fuse Rivets 94 2 Empennage Rivets…

Back to top