-RIVETED 2 MORE BAYS OF UPPER SKIN Manual Reference: 7-9 Installed Removed Rivets Today 90 0 Wing Rivets 2326 47 Total Project Rivets 4547 99 Hours 1.5 Total Hours 422 Statistics
Month: November 2016
-MATCH DRILLED AILERON HINGE BRACKET ASSYS-COUNTERSUNK AILERON HINGE BRACKET ASSYS WHERE REQUIRED-READ THROUGH SERVICE BULLETIN 16-03-28 (AFT SPAR CRACKING AT AILERON HINGE ATTACH) -SEPARATED & EDGE DEBURRED SB PLATES-ALUMIPREPPED & ALODINED SB PLATES AILERON HINGE BRACKET PIECES, FLAP BRACE &…
-STARTED BY INSTALLING AFT 4 RIVETS IN LH AILERON TO COMPLETE IT.-FOUND AND EDGE DEBURRED AILERON HINGE PLATES-FINISHED RIVETING TOP IB SKIN ON EXCEPT OVERLAP WITH OB SKIN & STARTED RIVETING OB SKIN ON Manual Reference: 7-9 Installed Removed Rivets…
-COMPLETED UPPER/LWR SKIN TO TOP SPAR FLANGE RIVETING -RIVETED UPPER NOSERIB-NOSE SKIN-RIVETED TOP ROW OF AFT SKIN-MAIN RIB RIVETS-INSTALLED ATTACH BRACKETS-CLECOED & WEIGHED DOWN AILERON -INSTALLED COUNTERBALANCE RIVETS-INSTALLED LWR FWD/MAIN RIB RIVETS-INSTALLED LWR SKINS-SPAR RIVETS***LH AILERON COMPLETE EXCEPT AFT MOST…
-REMOVED 2x RIVETS ON LH SPAR I ACCIDENTALY INSTALLED WHERE RIB GOES-CLECOED & MATCH DRILLED NOSE RIBS TO SPARS -CLECOED & MATCH DRILLED MAIN RIBS TO SPARS ***LH AILERON ONLY***-CLECOED SKINS ON & MATCH DRILLED/OPENED IP LWR SPAR HOLES TO…
-FOLDED TRAILING EDGES TO FINAL BEND-CUT 408 REINFORCEMENT BRACKETS OUT OF SUPPLIED .040″ MATERIAL-MATCH DRILLED REINFORCEMENT BRACKETS & AILERON ATTACH BRACKETS TO SPAR-DEBURRED, COUNTERSUNK & PRIMED 408 REINFORCEMENT BRACKETS-RIVETED 408 REINFORCEMENT BRACKETS TO SPARS & NUTPLATE TO LH ASSY ONLY…
-RIVETED 2 MORE BAYS OF UPPER IB SKIN RIVETS WITH THE HELP OF MY BROTHER BRAEDEN Manual Reference: 7-9 Installed Removed Rivets Today 104 2 Wing Rivets 1902 36 Total Project Rivets 4123 88 Hours 1.5 Total Hours 406.5 Statistics