EMPENNAGE COMPLETE

***EMPENNAGE COMPLETE***

EXCEPTIONS/NOTES
-ELEVATOR COUNTERWEIGHTS NOT SECURED, WAITING ON HARDWARE
-TRIM TAB HINGE PIN, LONGER PIN NEEDS TO BE INSTALLED & LOCKWIRED
-ELECTRIC TRIM SYSTEM NEEDS TO BE ATTACHED/ADJUSTED
-ROD END BEARINGS IN RUDDER REQUIRE LENGTH SETTING
-NO SWING, ALIGNMENT CHECKS CARRIED OUT
-HORI STAB CENTRE BEARING TO ELEV HORNS NOT DRILLED
-NO BOLTS TORQUED

EMPENNAGE TOTAL RIVETS – INST 2215 – REM 49
TOTAL PROJECT RIVETS – INST 2215 – REM 49

Manual Reference:

Hours: 1

Total Hours: 212.75

Taran