-FINISHED DRILLING RIGHT WING TOP SKINS Manual Reference: 7-4 Installed Removed Rivets Today 0 0 Wing Rivets 2507 50 Total Project Rivets 4728 102 Hours 1 Total Hours 443 Statistics
Month: November 2017
-CLECOED TOP SKINS IN PLACE, FOUND THAT I HADN’T DRILLED SPAR CHANNEL TO SPAR REINFORCEMENT PLATES SO REMOVED THE OUTER SKIN DRILLED THOSE AND REATTACHED OUTER SKIN. -DUE TO THE OTHER WING STILL BEING IN THE STAND THIS WING HAS…
-TEMP CLECOED UPPER SKINS IN PLACE AND MARKED SO AS TO AVOID MISTAKES & CONFUSION LATER -DRILLED WINGWALK DOUBLER TO 702 UPPER IB SKIN -CUT RIVET LINES OUT OF PROTECTIVE VINYL ON UPPER SKINS Manual Reference: 7-4 Installed Removed…
-RIVETED REMAINING REAR SPAR-RIB RIVETS-RIVETED ALL MAIN SPAR-RIB RIVETS Manual Reference: 7-3 Installed Removed Rivets Today 58 3 Wing Rivets 2507 50 Total Project Rivets 4728 102 Hours 2.5 Total Hours 437.5 Statistics
-STARTED RIVETING RIGHT WING SKELETON TOGETHER Manual Reference: 7-3 Installed Removed Rivets Today 47 0 Wing Rivets 2449 47 Total Project Rivets 4670 99 Hours 1 Total Hours 435 Statistics