LH ELEVATOR PREP

-CLECOED/DRILLED 610/611 PLATES TO SPAR
-FLUTED/DEBURRED 704/5 TIP RIBS THEN DRILLED TO SPAR
-RIVETED STIFFENERS TO LHS SKIN EXCEPT UPPER JKL IN TRANSIT FROM VANS


-MODIFIED DIMPLE DIE, DIMPLED PLATENUTS & RIVETED TO 615 PLATE


-RIVETED 615 PLATE TO SKIN


-DRILLED COUNTEBALANCE TO TO RIB/SKIN ASSY
-CLECOED SKELETON STRUCTURE TOGETHER
-FINAL DRILLED ROOT RIB & HORN TO STRUCTURE


-CLECOED SKIN TO SKELETON


-FINAL DRILLED UPPER HALF

RIVETS – INST 112 – REM 0
TOTAL PROJECT RIVETS – INST 1939 – REM 39

Manual Reference:

Hours: 2.75

Total Hours: 179.75

Taran

Back to top