Horizonatal Stab – Rear Spar Riveting

Today I
-Riveted HS609PP Spar Reinforcing Bars to the HS603PP spar channels.

-Riveted HS412PP & HS413PP Hinge brackets to Spar


-Installed Hinge Assy. on Spar with AN3-5A Bolts, AN960-10 Washers & AN365-1032 Nuts to a torque of 20-25in/lb

Manual Reference: HS/Rivet/S1-4

Hours: 3.5

Total Hours: 61.05

Taran

Back to top