HORIZONTAL STABILISER – REAR SPAR ASSY

THE PRIMER IS NOW DRY ON THE VA146 BEARING SO I RIVETED THE HS411’S AROUND THE BEARING WITH A -5 RIVET FOR THE FIRST RIVET, BUT LIKE MANY OTHER BUILDERS I WASN’T HAPPY WITH THE SHOP HEAD SO I DRILLED IT OUT AND DID ALL THE RIVETS WITH -6. (Refer DfD-0001)


-NEXT I CLECOED THE HS411 ASSEMBLY TO THE SPAR & ENLARGED THE ATTACHMENT HOLES TO #12 SIZE.


-I THEN MARKED THE PARTSSTEPS 9, 10 & 11 COMPLETE

Manual Reference: HS/R.S/Step 9-11

Hours: 0.75

Total Hours: 17.1

Taran

Back to top