HORIZONTAL STABILISER – REAR SPAR ASSY

TODAY I RECEIVED MY NEW HS411BPP & HS411APP BRACKETS SO I CLECOED THEM TO THE AFT HS SPAR WITH THE VA146 BEARING SANDWICHED BETWEEN THEM & DRILLED FOUR OF THE HOLES THROUGH TO THE HS411APP AS ONLY THE HS411BPP IS PUNCHED WITH THE HOLES FOR THE HINGE BEARING


I THEN REMOVED THE ASSEMBLY & DRILLED THE REMAINING TWO HOLES


NEXT I DEBURRED THE PARTS AND PRIMED THE VA146 BEARING WITH TEMPO ZINC PHOSPHATE SELF ETCHING PRIMER.

Manual Reference: HS/R.S ASSY / S6-8

Hours: 0.8

Total Hours: 14.2

Taran

Back to top