TODAY I RECEIVED MY NEW HS411BPP & HS411APP BRACKETS SO I CLECOED THEM TO THE AFT HS SPAR WITH THE VA146 BEARING SANDWICHED BETWEEN THEM & DRILLED FOUR OF THE HOLES THROUGH TO THE HS411APP AS ONLY THE HS411BPP IS PUNCHED WITH THE HOLES FOR THE HINGE BEARING

I THEN REMOVED THE ASSEMBLY & DRILLED THE REMAINING TWO HOLES

NEXT I DEBURRED THE PARTS AND PRIMED THE VA146 BEARING WITH TEMPO ZINC PHOSPHATE SELF ETCHING PRIMER.
Manual Reference: HS/R.S ASSY / S6-8
Hours: 0.8
Total Hours: 14.2
Taran
Related Posts
- 12 years ago
- 12 years ago
- 12 years ago
- 12 years ago


