TODAY I SMOOTHED THE EDGES AND FACES OF THE HS609PP BARS.THERE WAS A BIT OF SCRATCHING IN ONE OF THEM, BUT I WAS ABLE TO SAND THEM OUT.

NEXT I CLECOED THE STIFFENER BARS TO THE SPAR CHANNEL AND FINAL DRILLED ALL THE HOLES.
I THEN ENLARGED THE HS708 ATTACHMENT HOLES TO #21 SIZE

THEN I CLECOED HS412/413 BRACKETS TO SPAR CHANNEL AND MATCH DRILLED THEM WITH A #30 DRILL.
NEXT I MATCH DRILLED THE HS411APP THROUGH THE HS411BPP BUT I WASN’T HAPPY WITH THE ALIGNMENT OF THE HOLES SO I SCRAPPED THEM AND HAVE ORDERED NEW ONES FROM VAN’S.
COMPLETED STEPS 2, 3, 4, 5

Manual Reference: HS/R.S ASSY/S2-7
Hours: 3.3
Total Hours: 7.22