-DEBURRED & DIMPLED WINGWALK DOUBLER SKIN-ALUMIPREPPED/ ALODINED & PRIMED LE RIBS, WINGWALK DOUBLER & 423 SPLICE PLATE -HOLE DEBURRED BOTH INBOARD SKINS, STARTED HOLE DEBURRING LWR OUTBOARD SKIN Manual Reference: 7-8 Installed Removed Rivets Today 0 0 Wing Rivets 935…
Category: Wings
-HOLE DEBURRED LE RIBS-REMOVED EXTERIOR PLASTIC FROM LEADING EDGE SKIN-FINISHED HOLE/ EDGE DEBURRING LE SKIN-DIMPLED LE SKIN-DIMPLED LE RIBS -DIMPLED 423 SPLICE PLATE, DRILLED FOR NUTPLATES & DIMPLED -PRIMED LE SKIN INTERNALS -LEFT OUT PREPPING & PRIMING RIBS AND SPLICE…
-INSTALLED IB LWR FUEL TANK ATTACH PLATENUT USING BLIND RIVETS, SEE DFD22-HOLE & EDGE DEBURRED FUEL TANK-LEADING EDGE SPLICE PLATE-HOLE DEBURRED INSIDE AND LWR HALF OF EXTERIOR LE SKIN Installed Removed Rivets Today 0 0 Wing Rivets 935 26 Total…
-RIVETED NUTPLATES ONTO STALL WARNING ACCESS HATCH DOUBLER-RIVETED ACCESS HATCH DOUBLER TO LEADING EDGE SKIN DECIDED NOT TO INSTALL STALL WARNING SYSTEM AS I’M INSTALLING AN ANGLE OF ATTACK SYSTEM WHICH WILL WARN OF IMPENDING STALL. Installed Removed Rivets Today…
MOST OF TODAY WAS SPENT GETTING MY HEAD AROUND WHERE I WAS UP TO BEFORE THE 6 MONTH BREAK-DIMPLED #6 SCREW HOLES IN W822PP ACCESS PANELS THAT I’D SKIPPED EARLIER (REF 7-2 PARA 2)-FITTED AOA BUSHINGS AND RUN AOA &…
FINALLY BACK IN THE SHED AFTER A FEW MONTHS OFF-STARTED BY MAKING UP A LONG DRILL TO DRILL PITOT/AOA HOLES THROUGH THE WING WALK RIBS, AFTER A LOT OF THINKING I ENDED UP JUST WELDING A PIECE OF STEEL BAR…
-CLEANED UP ALL PARTS WITH MEK-CARRIED OUT CONTINUITY CHECK OF CAPACITIVE SENDER PLATES/PLUG-CARRIED OUT FINAL CLEARANCE CHECK ON FUEL TANK BAYS-TOOK VIDEO OF CLEARANCE CHECK – SEE VIDEO 20150420_154440_ -SEALED TERMINALS ON IB SENDER PLATE-RUN SEALANT ALONG BAFFLE RIVET LINES…
-TIDIED UP SURFACES TO BE SEALED WITH REAR BAFFLE-CLEANED ALL LOOSE ITEMS OUT OF TANK-GOT ALL PARTS READY TO CLOSE TANK Installed Removed Rivets Today 0 0 Wing Rivets 716 26 Total Project Rivets 2937 78 Hours 1.5 Total Hours…
-SEALED & RIVETED IB END RIB INTO PLACE-SEALED AND RIVETED T-405 & T-410 INTO PLACE -RUN SEALANT AROUND T-407 RING Manual Reference: 7-7 Installed Removed Rivets Today 48 0 Wing Rivets 716 26 Total Project Rivets 2937 78 Hours…
-INSTALLED IB CAPACITIVE FUEL PLATE -TRIAL FITTED VENT LINE, BENT IB END AS REQUIRED & CHOPPED OB END TO FIT CORRECTLY -FABRICATED PLATE TO COVER TOOLING HOLE ON END OF OB RIB-SEALED & RIVETED TOOLING HOLE COVER ONTO RIB &…