SEALING AND RIVETING OB END RIB INTO TANK

-INSTALLED IB CAPACITIVE FUEL PLATE 


-TRIAL FITTED VENT LINE, BENT IB END AS REQUIRED & CHOPPED OB END TO FIT CORRECTLY


-FABRICATED PLATE TO COVER TOOLING HOLE ON END OF OB RIB
-SEALED & RIVETED TOOLING HOLE COVER ONTO RIB & T410


*FOUND THAT RIVETING THE 410 ONTO THE RIB BOWED THE RIB MAKING IT VERY DIFFICULT TO RIVET INTO PLACE
-SEALED VENT LINE INTO CLIP WITH FUEL TANK SEALANT


-CLECOED OB END RIB INTO PLACE WITH EXTREME DIFFICULTY
-RIVETED OB END RIB INTO PLACE AND CLEANED UP
MADE A HUGE MESS BUT HOPEFULLY IT’LL SEAL OK

   

Manual Reference: 7-7, OP-7

InstalledRemoved
Rivets Today530
Wing Rivets66826
Total Project Rivets288978
Hours4
Total Hours318.75
Statistics

Taran