-AFTER CONSULTATION WITH THE SHEETMETAL GUYS AT WORK I DECIDED RATHER THAN CUT THE 703 FUEL TANK RIB ACCESS HOLE WITH A FLY CUTTER I’D JUST CHAIN DRILL AND CUT OUT.
-SO I CHAIN DRILLED AND CUT OUT THE 703 RIB ACCESS HOLE AND TIDIED IT UP

-I DRILLED THE UNCUT T411 ACCESS PANEL TO THE RIB, THEN CLECOED THE REINFORCEMENT RING & DRILLED NUTPLATE HOLES IN THE RIB

-NEXT I DEBURRED/COUNTERSUNK AND DIMPLED THE HOLES, THEN FORGETING TO ATTACH NUTPLATES STARTED RIVETING THE RING TO THE RIB
-AFTER 16 RIVETS REALIZED THAT I HAD MISSED THE NUTPLATES AND REMOVED THEM ALL AND RE RIVETED WITH THE NUTPLATES

Manual Reference:
RIVETS – INST 40 – REM 16
WING RIVETS – INST 447 – REM 24
TOTAL PROJECT RIVETS – INST 2662 – REM 71
Hours: 4
Total Hours: 285.25
Prev post
FUEL TANK WORK
Next post
FUEL TANK STIFFENERS
Taran
Related Posts
- 8 months ago
- 2 years ago
- 2 years ago
- 2 years ago
