FUEL TANK WORK

-BOLTED LAST Z BRACKET TO SPAR


-STRAPPED FUEL TANK ASSY TO WING


-DRILLED JOINT PLATE TO #19

-DRILLED INBOARD RIB TO Z BRACKET
-REMOVED OUTBOARD LEADING EDGE
-DRILLED OUTBOARD RIB TO Z BRACKET
-REMOVED SKIN AND INTERIOR RIBS OF FUEL TANK


-DRILLED ALL OF BAFFLE TO Z BRACKET 

Manual Reference: DFD-0021

RIVETS – INST 0 – REM 0
WING RIVETS – INST 407 – REM 8
TOTAL PROJECT RIVETS – INST 2622 – REM 55

Hours: 2

Total Hours: 281.25

Taran

Back to top