-BOLTED 3 ATTACH “Z” BRACKETS TO SPAR – NOT ROOT BRACKET AS I NEED A VERY THIN WALLED SOCKET TO DO UP BOLTS.
-CLECOS ARRIVED SO CLECOED FUEL TANK TOGETHER FULLY
Manual Reference:
RIVETS – INST 0 – REM 0
WING RIVETS – INST 407 – REM 8
TOTAL PROJECT RIVETS – INST 2622 – REM 55
Hours: 2
Total Hours: 279.25
Prev post
FUEL TANK SPAR NUTPLATES
Next post
FUEL TANK WORK
Taran
Related Posts
- 9 months ago
- 2 years ago
- 2 years ago
- 2 years ago