-DRILLED NEW RIBS TO TAB & ELEVATOR -DEBURRED & DIMPLED/COUNTERSUNK ALL TRIM TAB COMPONENTS TOTAL PROJECT RIVETS – INST 2137 – REM 42 Manual Reference: Hours: 2.5 Total Hours: 201.75
Month: April 2014
-REMOVED TAB MATERIAL FROM ELEVATOR TRIM TAB & FABRICATED RIBS TO REPLACE (SEE MOD-001) -CLAMPED HORNS 618 & 616 TOGETHER & MATCH DRILLED TO SKIN -MEASURED & CLAMPED HINGE TO TAB -MATCH DRILLED LOWER SPAR FLANGE TO SKIN -MATCH DRILLED…
-MEASURED ELECTRIC TRIM BRACKETS TO PANEL & CHANGED AS REQUIRED DUE TO MIRROR IMAGE ISSUES WITH THE PLANS -DRILLED BRACKETS TO PANEL -PRIMED BRACKETS -ROLLED RH ELEVATOR LEADING EDGE -FITTED RH ELEVATOR TO HORIZ STAB & REMOVED REQUIRED MATERIAL TOTAL…
-CUT OFF ELEVATOR TRIM OPENING TABS & FABRICATED RIB (SEE MOD-001) -RIVETED 703 TO 704 -RIVETED PLATENUTS/ REINFORCEMENT PLATES TO SPAR -RIVETED 705 ROOT RIB TO SPAR -RIVETED 703/4 ASSY TO SPAR -RIVETED SKIN TO 713 COUNTERBALANCE SKIN -INSERTED SKELETON…
PRIMED LH ELEVATOR COMPONENTS TOTAL PROJECT RIVETS – INST 1939 – REM 39 Manual Reference: Hours: 2 Total Hours: 188.25