BACK TO WORK, DRILLING RWING LWR SKINS

FINALLY GOT TIME TO GET BACK INTO THE RV WITH BEING STOOD DOWN FROM WORK
-CLEANED UP THE WORK AREA
-LUBED UP ALL AIR TOOLS
-CLEANED THE DUST OFF THE WING


-TOOK A BIT TO FIGURE OUT WHERE I’M AT
-IT LOOKS LIKE LAST TIME I WORKED I FITTED THE LWR RIGHT WING SKINS AND MATCH DRILLED MOST HOLES
-MOVED CLECOS OVER AND FINISHED MATCH DRILLING LWR MAIN SKINS
-TAPPED TIE DOWN ASSY
-FITTED TIE DOWN ASSY/ AILERON BELLCRANK BRACKETS WITH ALL 8 BOLTS AND TORQUED


-MARKED TIEDOWN LINES


-REMOVED LWR SKINS

Manual Reference: 7-2, 7-4

InstalledRemoved
Rivets Today00
Wing Rivets272656
Total Project Rivets4947108
Hours4
Total Hours456.5
Statistics

Taran

Back to top