-MATCH DRILLED AILERON HINGE BRACKET ASSYS
-COUNTERSUNK AILERON HINGE BRACKET ASSYS WHERE REQUIRED
-READ THROUGH SERVICE BULLETIN 16-03-28 (AFT SPAR CRACKING AT AILERON HINGE ATTACH)
-SEPARATED & EDGE DEBURRED SB PLATES
-ALUMIPREPPED & ALODINED SB PLATES AILERON HINGE BRACKET PIECES, FLAP BRACE & AILERON GAP FAIRING
-PRIMED SB PLATES AILERON HINGE BRACKET PIECES, FLAP BRACE & AILERON GAP FAIRING

Manual Reference: DWG10A, SB16-03-28
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2236 | 47 |
| Total Project Rivets | 4457 | 99 |
| Hours | 3.5 | |
| Total Hours | 420.5 |
Prev post
RIVETING LH TOP SKINS
Next post
ASSEMBLING AILERON ATTACH BRACKET ASSYS
Taran
Related Posts
- 8 months ago
- 2 years ago
- 2 years ago
- 2 years ago