Month: October 2015

WIRING HOLES/STALL WARNING

MOST OF TODAY WAS SPENT GETTING MY HEAD AROUND WHERE I WAS UP TO BEFORE THE 6 MONTH BREAK-DIMPLED #6 SCREW HOLES IN W822PP ACCESS PANELS THAT I’D SKIPPED EARLIER (REF 7-2 PARA 2)-FITTED AOA BUSHINGS AND RUN AOA &…

PITOT STATIC PLUMBING HOLES

FINALLY BACK IN THE SHED AFTER A FEW MONTHS OFF-STARTED BY MAKING UP A LONG DRILL TO DRILL PITOT/AOA HOLES THROUGH THE WING WALK RIBS, AFTER A LOT OF THINKING I ENDED UP JUST WELDING A PIECE OF STEEL BAR…

Back to top