WING NOSE RIB PREP

-SPENT A MONTH AWAY ON HOLIDAYS, SO ON RETURN I DECIDED TO FINISH THE PAINFULL JOB OF FLANGE DEBURRING THE NOSE RIBS
-OVER A PERIOD OF ABOUT A MONTH FINISHED DEBURRING THE NOSE RIB FWD FLANGE EDGES AT WORK IN MY FREE TIME.
-ALL RIB LIGHTNING HOLES STILL TO BE DEBURRED
-FLUTED ALL NOSE RIBS

Manual Reference: 7-2, 7-3

RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49

Hours: 8

Total Hours: 230.75

Taran

Back to top