STARTING FLAPS

-CLEANED UP LIGHTENING HOLE/EDGES ON FLAP SPARS
-DRILLED & CLECOED RIBS TO SPARS


-FABRICATED FL708 SHIMS
-THE RIBS WERE ALL CONTACTING THE REAR SPAR SO NO SHIMS WERE REQUIRED
-DRILLED RIBS TO REAR SPAR
-DRILLED RIBS TO BOTTOM SKIN
-MARKED 1/4″ LINE ON HINGES TO GET ALIGNMENT AND EDGE DISTANCE GOOD FOR DRILLING.


-CLAMPED AND DRILLED HINGES TO FLAP ASSY


-FITTED UPPER SKINS AND DRILLED FL-709 SHIMS TO ASSY
 

Manual Reference: 7-11

InstalledRemoved
Rivets Today00
Wing Rivets286260
Total Project Rivets5083112
Hours4
Total Hours470.5
Statistics

Taran

Back to top