-CLECOED TOP SKINS IN PLACE, FOUND THAT I HADN’T DRILLED SPAR CHANNEL TO SPAR REINFORCEMENT PLATES SO REMOVED THE OUTER SKIN DRILLED THOSE AND REATTACHED OUTER SKIN.

-DUE TO THE OTHER WING STILL BEING IN THE STAND THIS WING HAS TO BE WORKED ON THE BENCH WHICH MAKES MOST THINGS AWKWARD.
-DRILLED 1ST SET OF HOLES IN UPPER SKINS, NEED TO MOVE CLECOS AND DRILL THE REST BUT MY ARMS ARE TIRED FROM REACHING OVER THE WHOLE THING WITH A DRILL SO IT CAN WAIT FOR ANOTHER DAY
Manual Reference: 7-4
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2507 | 50 |
| Total Project Rivets | 4728 | 102 |
| Hours | 1.5 | |
| Total Hours | 442 |
Prev post
RIGHT WING PREPPING UPPER SKINS
Next post
RIGHT WING DRILLING TOP SKINS
Taran
Related Posts
- 8 months ago
- 2 years ago
- 2 years ago
- 2 years ago
