RH WING SKELETON DISSASSEMBLING/DEBURRING

-DISSASSEMBLED RH WING SKELETON
-DEBURRED BOTH SPARS
-DRILLED WIRING HOLE PILOTS IN RIBS USING TEMPLATE FROM LEFT WING
-DEBURRED BOTH RIBS
-OPENED UP WIRING HOLES TO 3/8

Manual Reference: 7-3

InstalledRemoved
Rivets Today00
Wing Rivets240247
Total Project Rivets462399
Hours2
Total Hours431.5
Statistics

Taran

Back to top