Month: May 2017

-DISSASSEMBLED RH WING SKELETON-DEBURRED BOTH SPARS-DRILLED WIRING HOLE PILOTS IN RIBS USING TEMPLATE FROM LEFT WING-DEBURRED BOTH RIBS-OPENED UP WIRING HOLES TO 3/8 Manual Reference: 7-3 Installed Removed Rivets Today 0 0 Wing Rivets 2402 47 Total Project Rivets 4623…

STARTING RH WING

-CLECOED MAIN SKELETON TOGETHER-REAMED RIBS TO SPARS-DISSASSEMBLED RH WING ASSY READY FOR DEBURRING/PRIMING Manual Reference: 7-3 Installed Removed Rivets Today 0 0 Wing Rivets 2402 47 Total Project Rivets 4623 99 Hours 1 Total Hours 429.5 Statistics

RH AILERON CORROSION

-FOUND SOME LIGHT CORROSION ON THE RIGHT AILERON SO REMOVED IT AND PRIMED THE LOWER FWD SKIN AREA Manual Reference: Installed Removed Rivets Today 0 0 Wing Rivets 2382 47 Total Project Rivets 4603 99 Hours 1 Total Hours 428…

Back to top