LANDING LIGHT WORK

-FINAL TORQUED TIEDOWN ASSY TO SPAR
-TIDIED UP LANDING LIGHT CUTOUT


-FABRICATED 2x RETAINER STRIPS TO SUIT LARGER CUTOUT



-MATCH DRILLED RETAINER STRIPS TO LEADING EDGE
-MATCH DRILLED NUTPLATE HOLES FROM OLD RETAINER STRIPS TO NEW ONES

-MARKED/DRILLED HOLES IN RIBS USING TEMPLATE (CORRECTLY THIS TIME!!)
-CLECOED NUTPLATES TO RIBS AND MATCH DRILLED



-POP RIVETED NUTPLATES TO RIBS
-INSTALLED LIGHT MOUNT BRACKET IN LEADING EDGE


-TRIMMED PLEXI LENS

Manual Reference: MOD005

InstalledRemoved
Rivets Today80
Wing Rivets112632
Total Project Rivets334784
Hours2.5
Total Hours365.5
Statistics

Taran

Back to top