CLOSING LH FUEL TANK

-CLEANED UP ALL PARTS WITH MEK-CARRIED OUT CONTINUITY CHECK OF CAPACITIVE SENDER PLATES/PLUG-CARRIED OUT FINAL CLEARANCE CHECK ON FUEL TANK BAYS-TOOK VIDEO OF CLEARANCE CHECK – SEE VIDEO 20150420_154440_ -SEALED TERMINALS ON IB SENDER PLATE-RUN SEALANT ALONG BAFFLE RIVET LINES…

PREPARING TO CLOSE LH TANK

-TIDIED UP SURFACES TO BE SEALED WITH REAR BAFFLE-CLEANED ALL LOOSE ITEMS OUT OF TANK-GOT ALL PARTS READY TO CLOSE TANK Installed Removed Rivets Today 0 0 Wing Rivets 716 26 Total Project Rivets 2937 78 Hours 1.5 Total Hours…

RIVETING RIB #6 INTO POSITION

-CLEANED UP ALL HOLES/COUNTERSINKS-USED TOOTHPICK WITH SEALANT UNDER THE RIVET HEADS TO INSTALL RIVETS WET-RIVETED RIB #6 INTO PLACE-MID WAY THROUGH COMPRESSOR STOPPED WORKING, SO BORROWED ANOTHER COMPRESSOR BUT DIDNT GET A CHANCE TO GET PICS-SEALED SHOP HEADS Manual Reference:…

LEFT FUEL TANK VENT LINE

-FLARED LH FUEL TANK VENT LINE-CRIMPED ALL REMAINING CAP FUEL SENSOR FITTINGS Manual Reference: 7-6, 7-7, 7-8 OP-7 Installed Removed Rivets Today 0 0 Wing Rivets 581 25 Total Project Rivets 2802 78 Hours 1 Total Hours 312.75 Statistics