FUEL TANK WORK

-DRILLED 1/8″ HOLE IN ALL 712 ANGLES
-TRIED TO BOLT ANGLES TO THE SPAR BUT HAD SOME ISSUES WITH THE PLATENUTS LINING UP SO DECIDED TO CALL IT AND HAVE A BEER

Manual Reference: 7-5

RIVETS – INST 0 – REM 0
WING RIVETS – INST 362 – REM 6
TOTAL PROJECT RIVETS – INST 2577 – REM 5

Hours: 1

Total Hours: 273.75

Taran

Back to top