Month: December 2014

FUEL TANK WORK

-DRILLED 1/8″ HOLE IN ALL 712 ANGLES -TRIED TO BOLT ANGLES TO THE SPAR BUT HAD SOME ISSUES WITH THE PLATENUTS LINING UP SO DECIDED TO CALL IT AND HAVE A BEER Manual Reference: 7-5 RIVETS – INST 0 –…

STARTING FUEL TANK

-MARKED VERTICAL CENTRELINE ON T-712 TANK ATTACH ANGLES -MARKED LENGTHWAYS CENTRE -DRILLED 6x 712 CENTRE FLANGES TO #12 -CLECOED ANGLES TO REAR OF SPAR -MATCH DRILLED REMAINING TANK ATTACH HOLES TO ANGLE -FABRICATED NUTPLATE JIG -DRILLED NUTPLATE HOLES TO 712…

LH WING DRILLING LEADING EDGE

-DRILLED AND TAPPED PITOT TUBE/MAST -MATCH REAMED LEADING EDGE ASSY. -ENLARGED TIEDOWN HOLE IN SKIN TO 7/16″, THE HOLE ENDED UP NICE AND CENTRAL ON THE TIEDOWN ASSY -SUMMER’S STARTING TO HIT SO ITS GETTING HARD TO SPEND EXTENDED PERIODS…

Back to top