-CLECOED LEADING EDGE ASSY TO SPAR
-DIMPLED UNDRILLED W-408 RIB AND SLID INTO PLACE ON THE IB END OF THE ASSY
-DRILLED REAR FLANGE THROUGH SPAR
-SLID TANK JOINT PLATE IN BETWEEN RIB AND SKIN AND DRILLED.
Manual Reference: 7-4, 7-5
RIVETS – INST 0 – REM 0
WING RIVETS – INST 326 – REM 6
TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 1
Total Hours: 268.75
Prev post
LH WING SKIN DRILLING
Next post
LH WING DRILLING LEADING EDGE
Taran
Related Posts
- 8 months ago
- 2 years ago
- 2 years ago
- 2 years ago
