TODAY I -CLECOED HS-710 (REINFORCEMENT ANGLE) & HS714 (SPLICE ANGLE) TO HS702 (FWD SPAR CHANNELS) -MATCH DRILLED HOLES INBOARD OF HS404/5 RIB ATTACH POINTS -TAPERED THE ENDS OF HS714 AS PER DRAWING 3 Manual Reference: HS/F.S ASSY/S1-3 Hours: 1.34 Total…
Month: June 2011
TODAY I SMOOTHED THE EDGES AND FACES OF THE HS609PP BARS.THERE WAS A BIT OF SCRATCHING IN ONE OF THEM, BUT I WAS ABLE TO SAND THEM OUT. NEXT I CLECOED THE STIFFENER BARS TO THE SPAR CHANNEL AND FINAL…
Today I Completed step one, which is: *Breaking The edges of both HS609PP bars *Checking bend of spar channel (HS603PP) in relation to HS609PP *Rounding the ends of HS-609PP Bars COMPLETED STEP 1 Manual Reference: HS/R.S ASSY/S1 Hours: 0.42 Total…
Today i finished my second practise kit (the control surface piece) now i’m ready to start the empennage. Manual Reference: Hours: 0 Total Hours: 3.5