-Removed access panel screws on LH fuel tank to remove for float sender installation but was unable to get the panel to move at all, then tried the RH side in preparation for the fuel tank repair and it was the same, unable to move at all – will have to do some research and come back to it
-Removed all the skins off the RH wing and removed all the vinyl – started to remove only the rivet lines externally as I have done previously but wasn’t happy with the light scratching the soldering iron was doing so just removed the whole thing
–found that peeling the edge off then taping to a pipe and rolling the vinyl off makes it much easier and less prone to buckling or damage
-Re made my skeleton brace to keep the wing from sagging, as I seem to keep doing i’ve somehow misplaced the old one
-Dimpled the screw holes on the fuel tank
-Hole deburred the leading edge ribs & joint strip
Manual Reference: 7-8
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 4012 | 76 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 6398 | 126 |
| Hours | 3 | |
| Total Hours | 571 |