-Finally mobile after knee surgery so got back into the garage and had a quick tidy up -Touched up the bare bits on the firewall and moved it out of the garage -Countersunk the platenuts for the 423 splice plate,…
Category: Firewall
-Continued firewall riveting -Riveted all brackets on -Tidied up some bucking bar damage on 601j brackets and touched up with alodine pen -Apart from rivets for cutout to be done later the firewall is done Manual Reference: 7-11 Installed Removed…
-Built a quick cradle to hold the firewall and make it easier to work on -Riveted Right hand side of firewall together Manual Reference: 7-11 Installed Removed Rivets Today 70 2 Wing Rivets 3387 73 Fuse Rivets 94 2 Empennage Rivets…
-REASSEMBLED FIREWALL WITH CLECOS-STARTED TO RIVET FIREWALL TOGETHER Manual Reference: 8-2 Installed Removed Rivets Today 24 0 Wing Rivets 2862 60 Fuse Rivets 24 0 Empennage Rivets 2215 49 Total Project Rivets 5107 109 Hours 3 Total Hours 489.5 Statistics
-HOLE DEBURRED ALL STIFFENERS, PLATES & BRACKETS-ALUMIPREPPED, ALODINED & PRIMED ALL STIFFENERS & PLATES Manual Reference: 8-2 Installed Removed Rivets Today 0 0 Wing Rivets 2862 60 Total Project Rivets 5083 112 Hours 2 Total Hours 486.5 Statistics
-FABRICATED F-601-E AND DRILLED TO FIREWALL ASSY-OPENED UP F-601TD BRAKE PLATE CENTRE HOLES TO 7/16″-DRILLED PLATENUTS TO F-601Z FUEL PUMP DOUBLER & FIREWALL-DISSASSEMBLED AND COUNTERSUNK ALL REQUIRED PARTS Manual Reference: 8-1 Installed Removed Rivets Today 0 0 Wing Rivets 2862…
-AS I’M STUCK FOR THE TIME BEING WAITING FOR BITS I JUMPED TO THE FIREWALL AS I CAN WORK ON THIS IN MY FREE TIME AT WORK WITHOUT AFFECTING ANYTHING ELSE-MOUNTED ALL STIFFENERS, SPACERS & GUSSETS TO THE FIREWALL AND…
WHILE I’M STUCK WAITING FOR PARTS I DECIDED TO MOVE ON TO SOMETHING TO KEEP ME WORKING.-ROUGHLY CUT OUT F-601J ANGLES -MARKED & FABRICATED F-601P SPACERS, F-601TD BRAKE PLATE & F601Z FUEL PUMP DOUBLER -FINISHED 601J ANGLE CUTTING-TIDIED UP ALL…