-Cut vent line to length & straightened
-Flared end, tidied up and fitted AN nut & sleeve
–Would have liked a better flare, it’s fine for the vent line but I think i’m gonna invest in a better flaring tool for future
-Marked recently received angle for T405 & started rough cutting
Manual Reference: 7-6
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 3453 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5839 | 124 |
| Hours | 1 | |
| Total Hours | 546 |
-Edge deburred tank skin & baffle
-Dimpled tank skin rivet holes
-Again struggling to find bits, this time the aluminium tube for the tank vent line, borrowed from the fuse kit however i’ll have to have a good look for other missing bits
Manual Reference: 7-6
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 3453 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5839 | 124 |
| Hours | 1 | |
| Total Hours | 545 |
-Made T-714 clip
-Removed cap assy and countersunk flange
-Hole deburred tank skin, cleaned adhesive residue off skin, turned out to be much more effort than expected, i’m gonna have to get some MEK to make this easier in future
-Hole Deburred Ribs, Baffle, Stiffeners & Z-Brackets
Manual Reference: 7-6
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 3453 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5839 | 124 |
| Hours | 4 | |
| Total Hours | 544 |
-Deburred & dimpled/countersunk IB rib & access panel ring


-Cleaned up IB rib & access panel ring & riveted together with nutplates




-Used rod end screwed into drain flange to center on hole and drilled to skin

-Drilled Fuel cap flange to skin using cap to center in cutout


Manual Reference: 7-6
| Installed | Removed | |
| Rivets Today | 24 | 0 |
| Wing Rivets | 3453 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5839 | 124 |
| Hours | 3 | |
| Total Hours | 540 |
-Disassembled tank, and removed vinyl
-Photocopied my plan sheet detail for the 405/410 drilling, scaled it to the correct size and used it to drill the T-410 reinforce plate, turns out I used the angle i was gonna borrow from the fuse kit on the firewall so i’m gonna have to source some more angle for that, I’ll come back to it later
-Fabricated my lost T-410 using my fuel tank access panel I’m not using anymore & match drilled it from the other one
-Marked, chain drilled & cleaned up hole in IB rib for access panel
-Drilled OB T-410 to rib
-Marked & Drilled T-708 access panel to rib
-Clecoed T-407 ring to assy and drilled nutplate holes to rib 
Manual Reference: 7-6
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 3429 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5815 | 124 |
| Hours | 4 | |
| Total Hours | 537 |
-Peeled back vinyl on aft fuel tank and countersunk spanwise skin holes

-After contacting Van’s about lost capacitive sender paperwork they advised that they would suggest reconsidering capacitive plates, so ordered float senders & will fit those on this initial install & will have to rework the other side
-Marked component positions & started disassembling tank
-Due to a cutting error made on the left side will have to borrow angle from the fuse kit for the t-405 & reorder later, also have lost a t-410 reinforcing plate so will have to fabricate one of those.
Manual Reference: 7-6
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 3429 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5815 | 124 |
| Hours | 1 | |
| Total Hours | 533 |
-Fitted & Drilled stiffeners to skin

-Removed components from spar & clecoed together in stand

-Drilled skin to ribs & baffle

Manual Reference: 7-5, 7-6
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 3429 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5815 | 124 |
| Hours | 2 | |
| Total Hours | 532 |
-Cut & cleaned up fuel tank stiffeners

-Fluted & straightened IB/OB ribs
-Mounted fuel tank ribs to baffle and final drilled to baffle/Zbrackets

Manual Reference: 7-5
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 3429 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5815 | 124 |
| Hours | 1.5 | |
| Total Hours | 530 |
-Mounted tank to spar, aligned and strapped in place



-Drilled tank skin to W-423 splice/joint plate

-Drilled inboard Rib – Tank Baffle – Z Bracket

-Removed outer Leading Edge & drilled Outboard Rib – Tank Baffle – Z Bracket


-Separated skin/inner ribs from the tank end ribs & baffle & removed
**Note – Figured out why I had such a hard time fitting the ribs into the skin, turns out I had missed fluting the tank ribs, so i’ll have to do that before I refit & drill the assy

-Drilled all remaining Baffle to Z Bracket holes

-This now has all the Z Brackets drilled to the baffle & spar so I can now continue per the manual.
Manual Reference: DfD-0021
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 3429 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5815 | 124 |
| Hours | 2.5 | |
| Total Hours | 528.5 |
-Had some time so decided to get back into the fuel tank
-Firstly there were mud wasp nests in the spar to fuse attach holes so thoroughly cleaned those out
-Countersunk all Z brackets & IB spar at Z bracket attach
-Salvaged almost enough k1000-3 platenuts from old Z brackets but had to substitute a few for the interchangeable MS21047L3 platenuts, riveted those to the Z brackets
-Riveted inboard platenuts to spar using blind rivets (refer DFD-22)
-Bolted all Z brackets to the spar
Manual Reference: DfD-0021, DfD-0022
| Installed | Removed | |
| Rivets Today | 42 | 1 |
| Wing Rivets | 3429 | 74 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5815 | 124 |
| Hours | 2 | |
| Total Hours | 526 |
-Continued firewall riveting
-Riveted all brackets on
-Tidied up some bucking bar damage on 601j brackets and touched up with alodine pen
-Apart from rivets for cutout to be done later the firewall is done
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 71 | 0 |
| Wing Rivets | 3387 | 73 |
| Fuse Rivets | 165 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5773 | 123 |
| Hours | 2 | |
| Total Hours | 524 |
-Built a quick cradle to hold the firewall and make it easier to work on
-Riveted Right hand side of firewall together
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 70 | 2 |
| Wing Rivets | 3387 | 73 |
| Fuse Rivets | 94 | 2 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5702 | 123 |
| Hours | 3 | |
| Total Hours | 522 |
-Riveted bottom skin-spar-hinge
-Right Flap Complete
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 57 | 0 |
| Wing Rivets | 3387 | 73 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5632 | 121 |
| Hours | 1 | |
| Total Hours | 519 |
-Finished riveting flap skins to each other
-Clecoed 706B to inboard rib, drilled to platenut, countersunk and riveted together
-Riveted both end ribs to assembly
-Slid spar in and pop riveted spar to ribs
-Drove top row of skin-spar rivets
-Riveted 706 a & b brackets together
-All thats left is to squeeze bottom row of skin-spar rivets
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 112 | 5 |
| Wing Rivets | 3330 | 73 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5575 | 121 |
| Hours | 2.5 | |
| Total Hours | 518 |
-Riveted another bay and a half completing internal ribs
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 34 | 1 |
| Wing Rivets | 3218 | 68 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5463 | 116 |
| Hours | 1 | |
| Total Hours | 515.5 |
-Riveted 706A to spar
-Removed fwd rivet from inboard rib nutplate that i mistakenly fitted earlier
-Found that although primer looks much better on this side its quite soft and scratches easily, doesn’t appear to have etched properly, my guess is it wasn’t thinned enough for the gun
-Riveted ribs to rear skin spar
-Started riveting ribs to skin and skins to each other working from the middle out, completed 2x bays
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 50 | 2 |
| Wing Rivets | 3184 | 67 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5429 | 116 |
| Hours | 2 | |
| Total Hours | 514.5 |
-Riveted all internal ribs to skins

-Riveted skins together at rear spar
-Found that some offcuts of kaizen foam from my toolbox made holding the bucking bar in place easier

-Realised I was meant to leave one of the bearing attach platenut rivets to go through the 706b so removed the rivet, mounted 706b to 704 rib and riveted together
-Started riveting inboard rib to skins but struggling to get the back of the aft 2 rivets to buck them

-After some reading found that its commonplace on the inboard rib to replace the aft 2x top/bottom & rivet adjacent to platenut with mk319-bs blind rivets, so squeezed those rivets
-Fitted spar and blind riveted spar to ribs
-Fitted hinge & squeezed bottom row of rivets
-Drove top row of rivets
-riveted 7061&b together
-The left flap’s done
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 259 | 5 |
| Wing Rivets | 3134 | 65 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5379 | 114 |
| Hours | 6 | |
| Total Hours | 512.5 |
-Removed vinyl and hole deburred right flap
-Edge deburred right flap
-Removed small amounts off edge/around hole corrosion
-Dimpled
-Primed all remaining bits, came up much better than last time, must not have been thouroughly mixed last time.

-Clecoed 706a/b to spar and riveted to spar
-Drilled & riveted rod end nutplateds to both side inboard ribs

-Started riveting ribs to skin

Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 13 | 0 |
| Wing Rivets | 2875 | 60 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5120 | 109 |
| Hours | 5 | |
| Total Hours | 506.5 |
-Continued deburring of right flap
-Found a fair bit of light surface corrosion on skin edges and around holes
-Removed corrosion
-Dimpled as required
Primed with P99 wash primer i’m trying out, didn’t come out as well as I had hoped with a fair bit of running but by the end got it figured out and hopefully I can do better next time
-Run out of time to work on the other side
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5107 | 109 |
| Hours | 3 | |
| Total Hours | 501.5 |
-Partially assembled both flaps in order to mount FL-706A & B brackets
-Clamped and match drilled brackets to spar, end rib and each other


-Opened up rod end attach points to 1/4″ but cant find the platenuts so that’ll have to wait
-Removed vinyl and started deburring & dimpling
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5107 | 109 |
| Hours | 3 | |
| Total Hours | 498.5 |
-Countersunk lower flap spars
-Hole deburred & dimpled remaining flap spar
-Deburred hinge
-Bent FL-706Bs brackets
Manual Reference:
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5107 | 109 |
| Hours | 1 | |
| Total Hours | 495.5 |
-Finished drilling the Z-Brackets to the spar
-Removed brackets

-Unfortunately when i previously restarted my brackets on the left side i didnt reorder the nutplates, so i needed to try and locate the old brackets and remove the nuts from them
-Removed nuts from old plates

-Still short 4x nuts so i’ll have to order more but i can make do for the time being
-Also couldnt’t find my nutplate drill gauge so I made a new one and started drilling z-plate holes
-Drilled all the Nutplate holes but also can’t find my 3/32 countersinking cutter so can’t really do much without that
Manual Reference: DFD21
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5107 | 109 |
| Hours | 3 | |
| Total Hours | 494.5 |
-Spent a while tidying garage up and figuring out where i was up to.
-Recieved a new rear baffle after previous issues also got another 200 clecoes in the order
-Properly clecoed right fuel tank ribs in place

-removed vinyl from rear baffle (carefully this time) and clecoed that in place
-Z brackets were already drilled
-Bolted brackets to spar

-Back drilled first 3 brackets to spar
Manual Reference: DFD21
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5107 | 109 |
| Hours | 2 | |
| Total Hours | 491.5 |
-REASSEMBLED FIREWALL WITH CLECOS
-STARTED TO RIVET FIREWALL TOGETHER
Manual Reference: 8-2
| Installed | Removed | |
| Rivets Today | 24 | 0 |
| Wing Rivets | 2862 | 60 |
| Fuse Rivets | 24 | 0 |
| Empennage Rivets | 2215 | 49 |
| Total Project Rivets | 5107 | 109 |
| Hours | 3 | |
| Total Hours | 489.5 |
-HOLE DEBURRED ALL STIFFENERS, PLATES & BRACKETS
-ALUMIPREPPED, ALODINED & PRIMED ALL STIFFENERS & PLATES


Manual Reference: 8-2
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Total Project Rivets | 5083 | 112 |
| Hours | 2 | |
| Total Hours | 486.5 |
-FABRICATED F-601-E AND DRILLED TO FIREWALL ASSY
-OPENED UP F-601TD BRAKE PLATE CENTRE HOLES TO 7/16″
-DRILLED PLATENUTS TO F-601Z FUEL PUMP DOUBLER & FIREWALL
-DISSASSEMBLED AND COUNTERSUNK ALL REQUIRED PARTS
Manual Reference: 8-1
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Total Project Rivets | 5083 | 112 |
| Hours | 2 | |
| Total Hours | 484.5 |
-AS I’M STUCK FOR THE TIME BEING WAITING FOR BITS I JUMPED TO THE FIREWALL AS I CAN WORK ON THIS IN MY FREE TIME AT WORK WITHOUT AFFECTING ANYTHING ELSE
-MOUNTED ALL STIFFENERS, SPACERS & GUSSETS TO THE FIREWALL AND DRILLED ASSY TOGETHER USING BOELUBE TO TRY AND KEEP MY DRILL BITS GOOD
-ALREADY FABRICATED F-601-P SPACERS SO MONTED AND DRILLED IN ASSY
**FORGOT TO GRAB MY ALUMINIUM ANGLE SO LEFT OUT THE F-601-E AND ITS HOLES TILL I CAN GET THAT BIT
-FILED & TIDIED UP F-601J & F601N EDGES TO FIT AS REQUIRED
-CLAMPED AND DRILLED F-601-J ASSYs TO FIREWALL
-DRILLED F-601TD BRAKE PLATE
**F-601TD BRAKE PLATE STILL REQUIRES CENTRE HOLES TO BE OPENED UP TO 7/16″, I CANNOT FIND MY UNI BIT SO THIS CAN BE DONE LATER
-CLECOED & DRILLED FIREWALL RECESS TO FIREWALL ASSY (THE FIREWALL RECESS WAS A PAIN TO FIT DUE TO THE FLANGES NOT BEING EXACTLY RIGHT BUT AFTER A BIT OF WORK GOT TEM TO SIT FLUSH TO THE FIREWALL)
-FITTED AND DRILLED F-601Z FUEL PUMP DOUBLER TO FIREWALL
**DONT HAVE PLATENUTS SO THEY’LL BE DRILLED TO FIREWALL LATER

Manual Reference: 8-1
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Total Project Rivets | 5083 | 112 |
| Hours | 4 | |
| Total Hours | 482.5 |
-DRILLED FLAP SKINS TO BOTH FLAPS
-FOR SOME REASON I REMOVED THE CUTTER FROM MY #40 MICROSTOP SO I’LL COUNTERSINK TO SPAR LATER
-DISASSEMBLED & DEBURRED/DIMPLED/PRIMED ALL RIBS

-TRIMMED PIANO HINGE TO CORRECT LENGTH
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Total Project Rivets | 5083 | 112 |
| Hours | 3.5 | |
| Total Hours | 478.5 |
FABRICATED FL-706 BRACKETS

Manual Reference:
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Total Project Rivets | 5083 | 112 |
| Hours | 1 | |
| Total Hours | 475 |
WHILE I’M STUCK WAITING FOR PARTS I DECIDED TO MOVE ON TO SOMETHING TO KEEP ME WORKING.
-ROUGHLY CUT OUT F-601J ANGLES

-MARKED & FABRICATED F-601P SPACERS, F-601TD BRAKE PLATE & F601Z FUEL PUMP DOUBLER

-FINISHED 601J ANGLE CUTTING
-TIDIED UP ALL BRACKETS

Manual Reference: 8-1
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Total Project Rivets | 5083 | 112 |
| Hours | 3.5 | |
| Total Hours | 474 |
-CLEANED UP LIGHTENING HOLE/EDGES ON FLAP SPARS
-DRILLED & CLECOED RIBS TO SPARS

-FABRICATED FL708 SHIMS
-THE RIBS WERE ALL CONTACTING THE REAR SPAR SO NO SHIMS WERE REQUIRED
-DRILLED RIBS TO REAR SPAR
-DRILLED RIBS TO BOTTOM SKIN
-MARKED 1/4″ LINE ON HINGES TO GET ALIGNMENT AND EDGE DISTANCE GOOD FOR DRILLING.

-CLAMPED AND DRILLED HINGES TO FLAP ASSY

-FITTED UPPER SKINS AND DRILLED FL-709 SHIMS TO ASSY
Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2862 | 60 |
| Total Project Rivets | 5083 | 112 |
| Hours | 4 | |
| Total Hours | 470.5 |
-COULDNT ACCESS THE TAIL TO RIVET THE FWD MOST LWR MAIN RIB RIVET SO REMOVED LWR BOLT OF BOTH BRACKETS, RIVETED & RETORQUED BOLTS
-POP RIVETED LWR SKIN-SPAR ROW
-CHECKED STRAIGHTNESS AND IT CAME OUT GOOD
-RH AILERON IS NOW COMPLETE
BOTH AILERONS DONE!!

Manual Reference: 7-11
| Installed | Removed | |
| Rivets Today | 48 | 0 |
| Wing Rivets | 2862 | 60 |
| Total Project Rivets | 5083 | 112 |
| Hours | 1 | |
| Total Hours | 466.5 |
DUE TO MY FUEL TANK BAFFLE ISSUES I DECIDED TO GET INTO SOMETHING ELSE AND THOUGHT I’D GIVE THE RIGHT AILERON RIVETING A GO WITH SOME ASSISTANCE
-MADE SOME BRACKETS TO HOLD THE AILERON STEADY I SAW ON ANOTHER BUILDERS PAGE


-REMOVED 3 RIVETS FROM THE TOP AILERON SKIN ROW AND SUCESSFULLY INSTALLED ALL WITH MY BROTHERS ASSISTANCE
-RIVETED TOP HALF OF NOSE RIBS
-RIVETED TOP ROW OF MAIN RIBS & MAIN RIBS TO SPAR


-INSTALLED & TORQUED 407/407 BRACKETS
-FILLED A FEW TOOBOXES WITH BUCKING BARS & WEIGHTED DOWN AILERON TO KEEP FLAT


-POP RIVETED LEADING EDGE SKIN TO COUNTERBALANCE BAR
-RIVETED LEADING EDGE LWR RIBS
-RIVETED WHAT I COULD ON THE MAIN RIBS BUT HAVE TO SWAP OUT SQUEEZER HEADS AND AM OUT OF TIME
Manual Reference: 7-10, 7-11
| Installed | Removed | |
| Rivets Today | 88 | 4 |
| Wing Rivets | 2814 | 60 |
| Total Project Rivets | 5035 | 112 |
| Hours | 3.5 | |
| Total Hours | 465.5 |
-REMOVED VINYL FROM INSIDE OF FUEL TANK SKIN
-STARTED REMOVING VINYL FROM REAR TANK BAFFLE BUT UNDERESTIMATED THE STRENGTH OF THE ADHESIVE AND ENDED UP BUCKLING THE BAFFLE
-TRIED STRAIGHTENING THE REAR BAFFLE BUT NOT SATISFIED SO I’LL HAVE TO ORDER A NEW ONE
-STARTED FITTING RIBS INTO SKIN, DIDN’T WORK OUT AS EASY AS BEFORE, ENDED UP CLECOING TOP ROW, FITTING INTO CRADLE THEN TEMPORARILY FITTING THE REAR BAFFLE TO PUSH RIBS INTO PLACE WHILE I CLECO THEM.

-MARKED CENTRE LINES ON THE Z-BRACKETS & DRILLED CENTER HOLE

Manual Reference: DFD-21
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2726 | 56 |
| Total Project Rivets | 4947 | 108 |
| Hours | 2.5 | |
| Total Hours | 462 |
-REMOVED VINYL FROM INSIDE RH LEADING EDGE
-CLECOED RIBS IN PLACE (THOSE LOWER CLECOES WERE PAINFUL TO TRY AND LINE UP)

-MOUNTED ON MAIN SPAR AND CLECOED IN PLACE


-SLID IB RIB INTO PLACE AND BACKDRILLED TO SPAR
-MEASURED, MARKED AND FITTED W423 SPLICE PLATE
-LINED UP IB RIB AND SPLICE PLATE AND DRILLED/CLECOED IB RIB TO SKIN & SPLICE PLATE

-MATCH REAMED ALL RIBS TO SKIN
-EXTENDED TIEDOWN LINES & OPENED UP TO 7/16″
Manual Reference: 7-4, 7-5
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2726 | 56 |
| Total Project Rivets | 4947 | 108 |
| Hours | 3 | |
| Total Hours | 459.5 |
FINALLY GOT TIME TO GET BACK INTO THE RV WITH BEING STOOD DOWN FROM WORK
-CLEANED UP THE WORK AREA
-LUBED UP ALL AIR TOOLS
-CLEANED THE DUST OFF THE WING

-TOOK A BIT TO FIGURE OUT WHERE I’M AT
-IT LOOKS LIKE LAST TIME I WORKED I FITTED THE LWR RIGHT WING SKINS AND MATCH DRILLED MOST HOLES
-MOVED CLECOS OVER AND FINISHED MATCH DRILLING LWR MAIN SKINS
-TAPPED TIE DOWN ASSY
-FITTED TIE DOWN ASSY/ AILERON BELLCRANK BRACKETS WITH ALL 8 BOLTS AND TORQUED


Manual Reference: 7-2, 7-4
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2726 | 56 |
| Total Project Rivets | 4947 | 108 |
| Hours | 4 | |
| Total Hours | 456.5 |
-CLECOED BOTTOM SKINS INTO PLACE
Manual Reference: 7-4
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2726 | 56 |
| Total Project Rivets | 4947 | 108 |
| Hours | 1 | |
| Total Hours | 452.5 |
-COMPLETED MY WING STORAGE STAND AND MOVED THE LEFT WING INTO THAT
-MOVED MY RIGHT WING INTO THE CONSTRUCTION STAND

-DRILLED, DEBURRED & DIMPLED THEN RIVETED AILERON GAP FAIRING TO SPAR AND TOP SKIN
***COULDN’T RIVET INBOARD-MOST AILERON GAP FAIRING RIVET DUE TO INTERFERENCE WITH NEW S.B AILERON MOUNT DOUBLERS, EMAILED VANS FOR ASSISTANCE***
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 83 | 1 |
| Wing Rivets | 2726 | 56 |
| Total Project Rivets | 4947 | 108 |
| Hours | 4 | |
| Total Hours | 451.5 |
-DRILLED OUTBOARD AILERON BRACKET TO SPAR/OB RIB
-TOUCHED UP TRIMMED INBOARD AILERON BRACKET WITH PRIMER
-I HAVE NOTICED THAT THE LWR RIVET ON BOTH THE BRACKETS IS A 426 (COUNTERSUNK) TYPE AND THE PLANS DON’T SEEM TO SHOW WHAT SIDE THE COUNTERSINK GOES ON, I’D IMAGINE IT ON THE AILERON SIDE FOR CLEARANCE BUT I’M GOING TO DO A BIT OF RESEARCH TO MAKE SURE I DON’T SCREW IT UP.
-AFTER A BIT OF RESEARCH FOUND THAT THE COUNTERSUNK RIVET IS INDEED ON THE AILERON SIDE TO GIVE CLEARANCE.
-REMOVED THE BRACKETS FROM THE SPAR AND COUNTERSUNK (THE CLEARANCE OF THE RIVET GOING THROUGH THE BRACKET MEANT THAT I HAD TO REMOVE THE COUNTERSINKING BIT FROM THE MICROSTOP AND COUNTERSINK IT BY HAND WITH THE DEBURRING HANDLE)

-ALODINED AND TOUCHED UP PRIMER ON BRACKETS
-WHILE WAITING FOR PRIMER ON BRACKETS TO DRY TRIED TO TRIAL FIT THE FLAP BRACE TO THE SPAR BUT FOUND IT REQUIRED TRIMMING.
–AFTER READING THROUGH PLANS FOUND A NOTE ON THE FLAP DRAWING (14A)
-TRIMMED & EDGE DEBURRED FLAP BRACE
-FITTED AND MATCH REAMED FLAP BRACE

-HOLE DEBURRED FLAP BRACE & TOUCHED UP TRIM AREA WITH ALODINE/PRIMER
-RIVETED AILERON BRACKETS IN POSITION ALONG WITH THE SB DOUBLERS
***INTENT OF S.B. 16-03-28 CARRIED OUT FOR THE LEFT WING IN THIS LOG ENTRY***
S.B. 16-03-28 MODIFICATIONS COMPLETED FOR LEFT WING, NO FURTHER ACTION NECESSARY FOR LEFT WING
Manual Reference: 7-9, S.B.16-03-28
| Installed | Removed | |
| Rivets Today | 18 | 5 |
| Wing Rivets | 2643 | 55 |
| Total Project Rivets | 4864 | 107 |
| Hours | 3.5 | |
| Total Hours | 447.5 |
-FINISHED RIVETING LEFT WING TOP SKINS

-FITTED AILERON HINGES INTO POSITION, HAD TO SAND A BIT OF THE UPPER EDGE OF THE INBOARD HINGE BRACKET TO STOP IT FOWLING ON THE SKIN-SPAR RIVETS
-DRILLED INBOARD BRACKET TO SPAR AND ALODINED GROUND OFF AREA
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 118 | 5 |
| Wing Rivets | 2625 | 55 |
| Total Project Rivets | 4846 | 107 |
| Hours | 1 | |
| Total Hours | 444 |
-CLECOED TOP SKINS IN PLACE, FOUND THAT I HADN’T DRILLED SPAR CHANNEL TO SPAR REINFORCEMENT PLATES SO REMOVED THE OUTER SKIN DRILLED THOSE AND REATTACHED OUTER SKIN.

-DUE TO THE OTHER WING STILL BEING IN THE STAND THIS WING HAS TO BE WORKED ON THE BENCH WHICH MAKES MOST THINGS AWKWARD.
-DRILLED 1ST SET OF HOLES IN UPPER SKINS, NEED TO MOVE CLECOS AND DRILL THE REST BUT MY ARMS ARE TIRED FROM REACHING OVER THE WHOLE THING WITH A DRILL SO IT CAN WAIT FOR ANOTHER DAY
Manual Reference: 7-4
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2507 | 50 |
| Total Project Rivets | 4728 | 102 |
| Hours | 1.5 | |
| Total Hours | 442 |
-TEMP CLECOED UPPER SKINS IN PLACE AND MARKED SO AS TO AVOID MISTAKES & CONFUSION LATER

-DRILLED WINGWALK DOUBLER TO 702 UPPER IB SKIN

-CUT RIVET LINES OUT OF PROTECTIVE VINYL ON UPPER SKINS
Manual Reference: 7-4
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2507 | 50 |
| Total Project Rivets | 4728 | 102 |
| Hours | 3 | |
| Total Hours | 440.5 |
-RIVETED REMAINING REAR SPAR-RIB RIVETS
-RIVETED ALL MAIN SPAR-RIB RIVETS
Manual Reference: 7-3
| Installed | Removed | |
| Rivets Today | 58 | 3 |
| Wing Rivets | 2507 | 50 |
| Total Project Rivets | 4728 | 102 |
| Hours | 2.5 | |
| Total Hours | 437.5 |
-STARTED RIVETING RIGHT WING SKELETON TOGETHER
Manual Reference: 7-3
| Installed | Removed | |
| Rivets Today | 47 | 0 |
| Wing Rivets | 2449 | 47 |
| Total Project Rivets | 4670 | 99 |
| Hours | 1 | |
| Total Hours | 435 |
-ALODINED MAIN RIBS
-PRIMED RIGHT WING MAIN RIBS

Manual Reference: 7-2
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2402 | 47 |
| Total Project Rivets | 4623 | 99 |
| Hours | 2.5 | |
| Total Hours | 434 |
-DISSASSEMBLED RH WING SKELETON
-DEBURRED BOTH SPARS
-DRILLED WIRING HOLE PILOTS IN RIBS USING TEMPLATE FROM LEFT WING
-DEBURRED BOTH RIBS
-OPENED UP WIRING HOLES TO 3/8

Manual Reference: 7-3
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2402 | 47 |
| Total Project Rivets | 4623 | 99 |
| Hours | 2 | |
| Total Hours | 431.5 |
-CLECOED MAIN SKELETON TOGETHER
-REAMED RIBS TO SPARS
-DISSASSEMBLED RH WING ASSY READY FOR DEBURRING/PRIMING
Manual Reference: 7-3
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2402 | 47 |
| Total Project Rivets | 4623 | 99 |
| Hours | 1 | |
| Total Hours | 429.5 |
-FINISHED RIVETING ONE MORE ROW OF RIB-SKIN RIVETS
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 20 | 0 |
| Wing Rivets | 2402 | 47 |
| Total Project Rivets | 4623 | 99 |
| Hours | 0.5 | |
| Total Hours | 428.5 |
-FOUND SOME LIGHT CORROSION ON THE RIGHT AILERON SO REMOVED IT AND PRIMED THE LOWER FWD SKIN AREA
Manual Reference:
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2382 | 47 |
| Total Project Rivets | 4603 | 99 |
| Hours | 1 | |
| Total Hours | 428 |
-RIVETED 2 MORE ROWS OF TOP SKIN LH WING
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 26 | 0 |
| Wing Rivets | 2382 | 47 |
| Total Project Rivets | 4603 | 99 |
| Hours | 1 | |
| Total Hours | 427 |
-ALREADY DEBURRED EDGES OF RIGHT WING RIBS WITH LEFT WING RIBS, SO ALL I HAD TO DO IS DEBURR THE RIGHT WING MAIN RIB LIGHTNING HOLES
Manual Reference: 7-3
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2356 | 47 |
| Total Project Rivets | 4577 | 99 |
| Hours | 1 | |
| Total Hours | 426 |
***THE POSITION OF THE LANDING LIGHT HAS BEEN ANNOYING ME FOR A WHILE & INADVERTANTLY INSTALLED THE LENS UPSIDE DOWN SO IT DIDN’T FIT RIGHT SO WHILE I’M WAITING FOR AN EXTRA SET OF HANDS FOR RIVETING I DECIDED TO FIDDLE WITH IT.
-MODIFIED MOUNT BRACKET & REPAINTED
-PAINTED INSIDE OF LEADING EDGE AROUND LIGHT AREA
-REPAINTED BRACKET
Manual Reference:
| Installed | Removed | |
| Rivets Today | 2 | 0 |
| Wing Rivets | 2356 | 47 |
| Total Project Rivets | 4577 | 99 |
| Hours | 1.5 | |
| Total Hours | 425 |
-ASSEMBLED & RIVETED AILERON BRACKET ASSEMBLIES TOGETHER
Manual Reference: DWG10A
| Installed | Removed | |
| Rivets Today | 28 | 0 |
| Wing Rivets | 2354 | 47 |
| Total Project Rivets | 4575 | 99 |
| Hours | 1.5 | |
| Total Hours | 423.5 |
-MATCH DRILLED AILERON HINGE BRACKET ASSYS
-COUNTERSUNK AILERON HINGE BRACKET ASSYS WHERE REQUIRED
-READ THROUGH SERVICE BULLETIN 16-03-28 (AFT SPAR CRACKING AT AILERON HINGE ATTACH)
-SEPARATED & EDGE DEBURRED SB PLATES
-ALUMIPREPPED & ALODINED SB PLATES AILERON HINGE BRACKET PIECES, FLAP BRACE & AILERON GAP FAIRING
-PRIMED SB PLATES AILERON HINGE BRACKET PIECES, FLAP BRACE & AILERON GAP FAIRING

Manual Reference: DWG10A, SB16-03-28
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 2236 | 47 |
| Total Project Rivets | 4457 | 99 |
| Hours | 3.5 | |
| Total Hours | 420.5 |
-RIVETED 2 MORE BAYS OF UPPER SKIN
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 90 | 0 |
| Wing Rivets | 2326 | 47 |
| Total Project Rivets | 4547 | 99 |
| Hours | 1.5 | |
| Total Hours | 422 |
-STARTED BY INSTALLING AFT 4 RIVETS IN LH AILERON TO COMPLETE IT.
-FOUND AND EDGE DEBURRED AILERON HINGE PLATES
-FINISHED RIVETING TOP IB SKIN ON EXCEPT OVERLAP WITH OB SKIN & STARTED RIVETING OB SKIN ON

Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 153 | 2 |
| Wing Rivets | 2236 | 47 |
| Total Project Rivets | 4457 | 99 |
| Hours | 3.5 | |
| Total Hours | 417 |
-COMPLETED UPPER/LWR SKIN TO TOP SPAR FLANGE RIVETING

-RIVETED UPPER NOSERIB-NOSE SKIN
-RIVETED TOP ROW OF AFT SKIN-MAIN RIB RIVETS
-INSTALLED ATTACH BRACKETS
-CLECOED & WEIGHED DOWN AILERON

-INSTALLED COUNTERBALANCE RIVETS
-INSTALLED LWR FWD/MAIN RIB RIVETS
-INSTALLED LWR SKINS-SPAR RIVETS
***LH AILERON COMPLETE EXCEPT AFT MOST 4 RIVETS WHICH I NEED A DIFFERENT SQUEEZER YOKE TO SET.
-INSTALLED AFT 4 RIVETS ON 29TH-NOV-16
***LH AILERON COMPLETE
Manual Reference: 7-10/7-11
| Installed | Removed | |
| Rivets Today | 141 | 3 |
| Wing Rivets | 2083 | 45 |
| Total Project Rivets | 4304 | 97 |
| Hours | 3 | |
| Total Hours | 413.5 |
-REMOVED 2x RIVETS ON LH SPAR I ACCIDENTALY INSTALLED WHERE RIB GOES
-CLECOED & MATCH DRILLED NOSE RIBS TO SPARS

-CLECOED & MATCH DRILLED MAIN RIBS TO SPARS
***LH AILERON ONLY***
-CLECOED SKINS ON & MATCH DRILLED/OPENED IP LWR SPAR HOLES TO #30
-REMOVED TRAILING EDGE & DRILLED NOSE RIBS TO BALANCE WEIGHT

-DISSASSEMBLED, DEBURRED & DIMPLED LHS PARTS
-RIVETED NOSE RIBS TO WEIGHT
-RIVETED LE RIBS TO LE SKIN
-REALISED I WASN’T SUPPOSED TO RIVET LE RIBS TO SKIN YET, SO REMOVED 4 RIVETS FROM LE SKIN-RIB TO ALLOW RIVETING ACCESS
-RIVETED LE RIBS TO SPAR
-STARTED RIVETING LE/TE SKINS TO UPPER EDGE OF SPAR
| Installed | Removed | |
| Rivets Today | 24 | 6 |
| Wing Rivets | 1942 | 42 |
| Total Project Rivets | 4163 | 94 |
| Hours | 2 | |
| Total Hours | 410.5 |
-FOLDED TRAILING EDGES TO FINAL BEND
-CUT 408 REINFORCEMENT BRACKETS OUT OF SUPPLIED .040″ MATERIAL
-MATCH DRILLED REINFORCEMENT BRACKETS & AILERON ATTACH BRACKETS TO SPAR
-DEBURRED, COUNTERSUNK & PRIMED 408 REINFORCEMENT BRACKETS
-RIVETED 408 REINFORCEMENT BRACKETS TO SPARS & NUTPLATE TO LH ASSY ONLY AS I’M MISSING ONE OF MY NUTPPLATES.
***ACCIDENTALY INSTALLED 426 RIVETS IN LH IB SIDE WHERE IT SHOULD GO THROUGH MAIN RIB, SO I’LL HAVE TO REMOVE 2 OF THOSE LATER
***LEFT 1/8″ CLECOS AT HOME SO CAN’T PROGRESS ASSEMBLY ANY MORE
| Installed | Removed | |
| Rivets Today | 16 | 2 |
| Wing Rivets | 1918 | 36 |
| Total Project Rivets | 4139 | 88 |
| Hours | 2 | |
| Total Hours | 408.5 |
-RIVETED 2 MORE BAYS OF UPPER IB SKIN RIVETS WITH THE HELP OF MY BROTHER BRAEDEN

Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 104 | 2 |
| Wing Rivets | 1902 | 36 |
| Total Project Rivets | 4123 | 88 |
| Hours | 1.5 | |
| Total Hours | 406.5 |
-DEBURRED LE & MAIN AILERON RIBS
–LE RIBS WERE VERY FIDDLY, FOUND IT BEST TO USE A COMBINATION OF NEEDLE FILES, STRIPS OF SANDPAPER & SCOTCHBRITE
-PREPPED & PRIMED LE/MAIN RIBS & COUNTERBALANCE
Manual Reference: 7-10
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1798 | 34 |
| Total Project Rivets | 4019 | 86 |
| Hours | 2 | |
| Total Hours | 405 |
-PREPPED, DEBURRED & PRIMED AILERON LE SKINS & SPARS


Manual Reference: 7-10
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1798 | 34 |
| Total Project Rivets | 4019 | 86 |
| Hours | 2 | |
| Total Hours | 403 |
-TIDIED THE SHED UP A BIT
-DEBURRED FLAP & AILERON BRACES IN PREPARATION FOR USE
-RIVETED 2 RIBS ON THE IB UPPER SKIN
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 59 | 0 |
| Wing Rivets | 1798 | 34 |
| Total Project Rivets | 4019 | 86 |
| Hours | 2 | |
| Total Hours | 401 |
-FILED IB SKIN CORNER THAT IS OVERLAPPED BY THE OB SKIN
-STARTED RIVETING TOP IB SKIN ON, BUT BY MYSELF IT’S TOO AWKWARD
| Installed | Removed | |
| Rivets Today | 4 | 0 |
| Wing Rivets | 1739 | 34 |
| Total Project Rivets | 3960 | 86 |
| Hours | 1.5 | |
| Total Hours | 399 |
-CLEANED & PRIMED AILERON SKIN
-RIVETED STIFFENERS TO SKIN
Manual Reference: 7-10
| Installed | Removed | |
| Rivets Today | 112 | 0 |
| Wing Rivets | 1623 | 34 |
| Total Project Rivets | 3844 | 86 |
| Hours | 2.5 | |
| Total Hours | 395 |
-CLEANED & PRIMED AILERON SKIN
-RIVETED STIFFENERS TO SKIN
Manual Reference: 7-10
| Installed | Removed | |
| Rivets Today | 112 | 0 |
| Wing Rivets | 1735 | 34 |
| Total Project Rivets | 3956 | 86 |
| Hours | 2.5 | |
| Total Hours | 397.5 |
-PREPPED LH WING TO INSTALL TOP SKINS
-CLECOED IB TOP SKIN ON, BUT LEFT MY RIVET SETS AT WORK SO RIVETING WILL HAVE TO WAIT
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1511 | 34 |
| Total Project Rivets | 3732 | 86 |
| Hours | 1 | |
| Total Hours | 392.5 |
-ROLLED FUEL TANK EDGES USING MY NEW EDGE ROLLER
-STRAPPED LEADING EDGE DOWN TO ALIGN HOLES BETTER

-BOLTED AND SCREWD LEADING EDGE DOWN, SAT MUCH BETTER, STILL A BIT OF PILLOWING BETWEEN SEAM SCREWS BU THIS IS AS GOOD AS I’LL GET IT
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1511 | 34 |
| Total Project Rivets | 3732 | 86 |
| Hours | 1.5 | |
| Total Hours | 391.5 |
-AFTER CONSULTING WITH VANS DECIDED TO STOP DRILL DAMAGED DIMPLES & THEY WILL BE PERIODICALLY INSPECTED AS PER DFD26
-SO STOP DRILLED 4x DAMAGED DIMPLES & MANUFACTURED DOUBLERS (DECIDED NOT TO USE DOUBLERS)
Manual Reference: DFD-0026
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1511 | 34 |
| Total Project Rivets | 3732 | 86 |
| Hours | 1 | |
| Total Hours | 390 |
-REMOVED MORE EXCESS FUEL TANKS SEALANT AND INSTALLED ONTO SPAR
-STILL SAT PROUD ALONG THE SPAR SO REMOVED AND REMOVED EXCESS SEALANT SPANWISE
-WHILE DOING THIS FOUND THAT 3 INBOARD-MOST SCREW HOLES ON TANK WERE ELONGATED AND CRACKED
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1481 | 34 |
| Total Project Rivets | 3702 | 86 |
| Hours | 1 | |
| Total Hours | 388 |
-RIVETED REAR SPAR ASSY TOGETHER
Manual Reference: 7-2
| Installed | Removed | |
| Rivets Today | 30 | 0 |
| Wing Rivets | 1511 | 34 |
| Total Project Rivets | 3732 | 86 |
| Hours | 1 | |
| Total Hours | 389 |
-FLIPPED WING OVER TO MAKE RIVETING EASIER
-RIVETED 3x INBOARD RIBS TO SPAR
-RIVETED THE LOWER SPANWISE ROW OF RIVETS

-INSTALLED FUEL TANK ASSY & DECIDED TO INSTALL ALL SCREWS AND BOLTS INSTED OF THE HALF THE MANUAL CALLS OUT, I CAN’T SE WHY TO ONLY PUT HALF IN & ALL I CAN SEE THAT DOING IS CAUSING HOLE MISALIGNMENT ISSUES WHEN I TRY TO PUT ALL THE OTHERS IN.
-INSTALLED ALL SCREWS AND BOLTS LOOSELY, ONCE ALL WERE IN STARTED TO RUN SCREWS DOWN BUT DIDN’T LIKE BULGES I WAS GETTING BETWEEN SCREWS AT FUEL TANK SPLICE PLATE.
-REMOVED FUEL TANK AND MEASURED SPLICE & WHERE SEALANT ENDS ON TANK AND FOUND THAT THE SEALANT WAS INTERFERING WITH THE SPLICE PLATE
-REMOVED A SMALL AMOUNT OF EXCESS SEALANT FROM THE TANK & A SMALL AMOUNT OF MATERIAL FROM THE SPLICE PLATE
-HIT ALL BARE MATING SURFACES WITH THE ALODINE PEN
-REFITTED, STILL NOT HAPPY SO REMOVED AGAIN
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 80 | 0 |
| Wing Rivets | 1481 | 34 |
| Total Project Rivets | 3702 | 86 |
| Hours | 3 | |
| Total Hours | 387 |
-POP RIVETED OUTBOARD SINGLE RIVET & 2ND, 3RD RIB FROM OUTBOARD TO SPAR
-WAITING ON LP4-4 RIVETS SO CANT RIVET THE INBOARD 3x RIBS
-RIVETED TOP ROW OF LE SKIN-SPAR RIVETS
Manual Reference: 7-9, DFD-25
| Installed | Removed | |
| Rivets Today | 74 | 0 |
| Wing Rivets | 1401 | 34 |
| Total Project Rivets | 3622 | 86 |
| Hours | 2 | |
| Total Hours | 384 |
-RIVETED REINFORCEMENT FORK TOP ROW OF RIVETS BUT WAS UNHAPPY WITH THE FIT OF THE SQUEEZER CUP AGAIN, SO I’M GOING TO BUY YET ANOTHER CUP

-RIVETED THE TIEDOWN ASSY TOGETHER


-DIMPLED BOTH AILERON SKINS
PICTURES- 1718-1722_x000D_
Manual Reference: 7-2
| Installed | Removed | |
| Rivets Today | 34 | 0 |
| Wing Rivets | 1322 | 34 |
| Total Project Rivets | 3543 | 86 |
| Hours | 1.5 | |
| Total Hours | 381.5 |
-STARTED RIVETING LEADING EDGE ASSY TO MAIN SPAR
–LWR TIP RIB CORNER OF LE RIB FLANGE BENT UP, MEANING I CAN’T GET A GOOD RIVET JOB SO I STOPPED FOR THE DAY
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 4 | 0 |
| Wing Rivets | 1326 | 34 |
| Total Project Rivets | 3547 | 86 |
| Hours | 0.5 | |
| Total Hours | 382 |
-DRILLED/ DIMPLED UPPER REAR SPAR FLANGE HOLES WHERE THE REINFORCE FORK SITS
-CAN’T FIND MY #4 RIVET SET, SO HELD UP YET AGAIN BY MISSING TOOLS
Manual Reference: 7-2
Hours: 0.5
Total Hours: 380
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1288 | 34 |
| Total Project Rivets | 3509 | 86 |
| Hours | 0.5 | |
| Total Hours | 380 |
-DEBURRED REAR SPAR COMPONENTS
-ALUMIPREPPED & ALODINED REAR SPAR COMPONENTS & LEFT WING UPPER SKINS
-PRIMED SPAR COMPONENTS & LEFT WING UPPER SKINS


Manual Reference: 7-2
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1288 | 34 |
| Total Project Rivets | 3509 | 86 |
| Hours | 2.5 | |
| Total Hours | 379.5 |
-CUT TIEDOWN SPACERS OUT OF SUPPLIED BAR-DRILLED LIGHTNING HOLE OUT OF SPACERS

-MEASURED AND DRILLED REFERENCE POINT ON 731 TIEDOWN BAR
-CLAMPED SPACERS AND TIEDOWN BAR TO SPAR AND DRILLED ATTACH HOLES
-DRILLED COUNTERSUNK ASSY FOR PLATENUTS

-PREPPED SPACERS & TIEDOWN BAR FOR PRIMING
REAR SPAR
-FOUND SOME LIGHT CORROSION ON THE REAR SPAR CHANNEL WHEN I REMOVED THE VINYL.
-CORROSION REMOVED REFER DFD23

-MARKED & TRIMMED 707D & G AS PER DWG 38
-EDGE DEBURRED SPAR, REINFORCEMENT FORK & REINFORCEMENT PLATES
-MATCH DRILLED DOUBLER PLATES TO SPAR
-CUT OUT AILERON PUSHROD HOLE IN DOUBLER

-INSTALLED AND MATCH DRILLED REINFORCEMENT FORK AND PLATE
Manual Reference: 7-2
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1288 | 34 |
| Total Project Rivets | 3509 | 86 |
| Hours | 4 | |
| Total Hours | 377 |
-DIMPLED WING ACCESS PANELS SPAR ROW
-COUNTERSUNK SPAR TO FIT ACCESS PANELS

-TOUCHED UP ALL COUNTERSINKS WITH ALODINE PEN
-ATTACHED CENTRE SECTION NUTPLATES TO THE SPAR
Manual Reference: 7-2
| Installed | Removed | |
| Rivets Today | 4 | 0 |
| Wing Rivets | 1288 | 34 |
| Total Project Rivets | 3509 | 86 |
| Hours | 1 | |
| Total Hours | 373 |
-GAVE THE SHED A TIDY UP
-STILL CAN’T FIND MY OFFSET RIVET SET TO FINISH MY LEFT WING SO I DECIDED TO START ON MY RIGHT WING.
-FIRSTLY I SLID THE LEFT WING INTO THE BACK OF THE STAND AND TEMPORARILY MODIFIED THE ARMS TO HOLD THE RIGHT SPAR AS WELL.

-DRILLED, DEBURRED AND RIVETED TANK ATTACH PLATENUTS TO SPAR
-DRILLED, DEBURRED AND RIVETED ACCESS PANEL PLATENUTS TO SPAR
-COUNTERSUNK TANK ATTACH SCREW HOLES
Manual Reference: 7-2, 7-2
| Installed | Removed | |
| Rivets Today | 144 | 0 |
| Wing Rivets | 1284 | 34 |
| Total Project Rivets | 3505 | 86 |
| Hours | 2.5 | |
| Total Hours | 372 |
-FITTED LEADING EDGE ASSY TO SPAR AND CLECOED ON
-CLEANED UP FUEL TANK MATING SURFACES & DIMPLED SCREW HOLES FOR #8 SCREW
-TRIAL FITTED FUEL TANK TO SPAR
-TORE MY SHED APART TRYING TO FIN MY OFFSET RIVET SET WITHOUT LUCK
-DIMPLED OUTBOARD UPPER SKIN
Manual Reference: DWG16A, 7-9
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1140 | 34 |
| Total Project Rivets | 3361 | 86 |
| Hours | 2 | |
| Total Hours | 369.5 |
-DRILLED LENS TO SKIN

-DRILLED LENS-SKIN TO #30
-DRILLED LENS TO 5/32 AND COUNTERSUNK
-PREPPED REATINING STRIPS & RIVETED NUTPLATES ON


-INSTALLED LAMP ASSY INTO BRACKET
-TRIED TO INSTALL LENS BUT REALIZED I’D INADVERTANTLY FITTED A LARGE NUTPLATE ON RETAINING STRIPS, SO REMOVED NUTPLATE AND INSTALLED THE CORRECT ONE
-FINALLY INSTALLED LENS

***LANDING LIGHT INSTALLATION COMPLETE, EXCEPT WIRING AND MOISTURE BARRIER TAPE, WILL INSTALL THAT ONCE LIGHTS ARE ADJUSTED
Manual Reference: MOD005
| Installed | Removed | |
| Rivets Today | 14 | 2 |
| Wing Rivets | 1140 | 34 |
| Total Project Rivets | 3361 | 86 |
| Hours | 2 | |
| Total Hours | 367.5 |
-FINAL TORQUED TIEDOWN ASSY TO SPAR
-TIDIED UP LANDING LIGHT CUTOUT

-FABRICATED 2x RETAINER STRIPS TO SUIT LARGER CUTOUT


-MATCH DRILLED RETAINER STRIPS TO LEADING EDGE
-MATCH DRILLED NUTPLATE HOLES FROM OLD RETAINER STRIPS TO NEW ONES
-MARKED/DRILLED HOLES IN RIBS USING TEMPLATE (CORRECTLY THIS TIME!!)
-CLECOED NUTPLATES TO RIBS AND MATCH DRILLED


-POP RIVETED NUTPLATES TO RIBS
-INSTALLED LIGHT MOUNT BRACKET IN LEADING EDGE
Manual Reference: MOD005
| Installed | Removed | |
| Rivets Today | 8 | 0 |
| Wing Rivets | 1126 | 32 |
| Total Project Rivets | 3347 | 84 |
| Hours | 2.5 | |
| Total Hours | 365.5 |
-AFTER CONSULTING OTHER BUILDERS I DECIDED TO EXTEND THE LANDING LIGHT CUTOUT 1.5″ OUTBOARD SO THE LED LAMPS WOULD LINE UP, THIS WILL ALSO GIVE THE BENEFIT OF BETTER LIGHT DISPURSION INBOARD.
-MARKED AND ROUGHLY CUT OUT THE EXTENDED HOLE BUT DIDN’T HAVE MY ROTARY BURR HERE TO TIDY IT UP
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 0.5 | |
| Total Hours | 363 |
-CUT OUT AND LAID TEMPLATE OVER LEADING EDGE

-CUT OUT ROUGH LANDING LIGHT HOLE IN THE LEADING EDGE
-FOUND IT REALLY EASY TO CUT WITH THE DREMEL CUT-OFF WHEEL & ROTARY BURR

***FOUND THAT I’D FITTED THE TEMPLATE UPSIDE DOWN WHEN I MARKED SO THE CUTOUT WAS 1.5″ INBOARD OF WHERE IT WAS SUPPOSED TO BE
Manual Reference: MOD005
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 1 | |
| Total Hours | 362.5 |
MY LANDING LIGHTS ARRIVED TODAY FROM DUCKWORKS, I ORDERED THE LED LIGHTS .
-I STARTED BY PRIMING AND PAINTING THE LIGHT MOUNT BRACKET BLACK TO MATCH THE LIGHT AS THIS WILL BE CLOSED UP SOON AND I DONT WANT IT TO LOOK OUT



Manual Reference: MOD005
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 0.5 | |
| Total Hours | 361.5 |
-CLEANED, DIMPLED & PRIMED AILERON STIFFENERS
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 0.5 | |
| Total Hours | 360.5 |
-CLEANED, DIMPLED & PRIMED AILERON STIFFENERS
Manual Reference:
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 0.5 | |
| Total Hours | 361 |
DIMPLED BOTH INBOARD SKINS

Manual Reference:
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 1 | |
| Total Hours | 360 |
-FIGURED OUT WHICH WAY WAS UP & DOWN & MARKED SKIN & SPAR
-MATCH DRILLED STIFFENERS TO SKIN
-DEBURRED SKINS
-DEBURRED STIFFENERS

Manual Reference: 7-10
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 1 | |
| Total Hours | 358 |
-FIGURED OUT WHICH WAY WAS UP & DOWN & MARKED SKIN & SPAR
-MATCH DRILLED STIFFENERS TO SKIN
-DEBURRED SKINS
-DEBURRED STIFFENERS

Manual Reference: 7-10
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 1 | |
| Total Hours | 359 |
-HAD CLEARANCE ISSUES WITH HANDLE HITTING LARGE ALUMINIUM SHEETS ON MY DIMPLER SO I MADE A NEW HANDLE WHICH SHOULD STOP THIS ISSUE
Manual Reference:
Hours: 1
Total Hours: 357
-COUNTERSUNK ALL HOLES ON MAIN SPAR


-TRIED TO “TOUCH UP” REAR SPAR DIMPLES WITH COUNTERSINKER BUT THE DIMPLES SEEM TO BE DEEP ENOUGH ALREADY
-TOUCHED UP ALL COUNTERSINKS WITH ALODINE PEN.

-FOUND THAT THE JACK THAT WAS KEEPING THE WING FROM SAGGING IN THE CENTRE KEEPS SLOWLY DROPPING, SO I MADE A SMALL STAND TO KEEP THE WING LEVEL
Manual Reference: 7-8/7-9
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 2 | |
| Total Hours | 356 |
-DEBURRED REAR SPAR
-DEBURRED MAIN SPAR
-DIMPLED RIBS
-DIMPLED REAR SPAR
*ALL THAT REMAINS IS COUNTERSINKING OF SPARS AND SKIN EDGE DEBURRING
*I’VE ORDERED MY DUCKWORKS LED LANDING LIGHTS AS WELL SO I’LL HAVE TO WAIT TILL THEY COME BEFORE I RIVET MY LEADING EDGE TO THE SPAR
Manual Reference: 7-8
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 2.5 | |
| Total Hours | 354 |
-HOLE DEBURRED WING RIBS
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 1.5 | |
| Total Hours | 351.5 |
*STARTED WORKING ON THE AILERONS AT WORK IN MY FREE TIME
-TRIMMED AILERON STIFFENERS
-TIDIED UP & EDGE DEBURRED STIFFENERS
Manual Reference: 7-10
Hours: 1.5
Total Hours: 348.5
*STARTED WORKING ON THE AILERONS AT WORK IN MY FREE TIME
-TRIMMED AILERON STIFFENERS
-TIDIED UP & EDGE DEBURRED STIFFENERS
Manual Reference: 7-10
Hours: 1.5
Total Hours: 350
-RIVETED ALL REMAINING LEADING EDGE RIVETS
| Installed | Removed | |
| Rivets Today | 105 | 5 |
| Wing Rivets | 1118 | 32 |
| Total Project Rivets | 3339 | 84 |
| Hours | 3 | |
| Total Hours | 347 |
-RIVETED AFT 2 RIVETS ON ALL LE RIBS
-RIVETED #1 RIB IN
Manual Reference: 7-9
| Installed | Removed | |
| Rivets Today | 50 | 1 |
| Wing Rivets | 1013 | 27 |
| Total Project Rivets | 3234 | 79 |
| Hours | 1.5 | |
| Total Hours | 344 |
-FINISHED HOLE DEBURRING SKINS
-HOLE DEBURRED UPPER FACING HOLES ON SKELETON
-RIVETED NUTPLATES ONTO 423 SPLICE PLATE
Manual Reference: 7-8, 7-9
| Installed | Removed | |
| Rivets Today | 28 | 0 |
| Wing Rivets | 963 | 26 |
| Total Project Rivets | 3184 | 78 |
| Hours | 3.75 | |
| Total Hours | 342.5 |
-DEBURRED & DIMPLED WINGWALK DOUBLER SKIN
-ALUMIPREPPED/ ALODINED & PRIMED LE RIBS, WINGWALK DOUBLER & 423 SPLICE PLATE

-HOLE DEBURRED BOTH INBOARD SKINS, STARTED HOLE DEBURRING LWR OUTBOARD SKIN
Manual Reference: 7-8
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 935 | 26 |
| Total Project Rivets | 3156 | 78 |
| Hours | 3.25 | |
| Total Hours | 338.75 |
-HOLE DEBURRED LE RIBS
-REMOVED EXTERIOR PLASTIC FROM LEADING EDGE SKIN
-FINISHED HOLE/ EDGE DEBURRING LE SKIN
-DIMPLED LE SKIN
-DIMPLED LE RIBS

-DIMPLED 423 SPLICE PLATE, DRILLED FOR NUTPLATES & DIMPLED

-LEFT OUT PREPPING & PRIMING RIBS AND SPLICE PLATE UNTIL WEATHER IMPROVES
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 935 | 26 |
| Total Project Rivets | 3156 | 78 |
| Hours | 2.75 | |
| Total Hours | 335.5 |
-INSTALLED IB LWR FUEL TANK ATTACH PLATENUT USING BLIND RIVETS, SEE DFD22
-HOLE & EDGE DEBURRED FUEL TANK-LEADING EDGE SPLICE PLATE
-HOLE DEBURRED INSIDE AND LWR HALF OF EXTERIOR LE SKIN

| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 935 | 26 |
| Total Project Rivets | 3156 | 78 |
| Hours | 1.5 | |
| Total Hours | 332.75 |
-RIVETED NUTPLATES ONTO STALL WARNING ACCESS HATCH DOUBLER
-RIVETED ACCESS HATCH DOUBLER TO LEADING EDGE SKIN


DECIDED NOT TO INSTALL STALL WARNING SYSTEM AS I’M INSTALLING AN ANGLE OF ATTACK SYSTEM WHICH WILL WARN OF IMPENDING STALL.
| Installed | Removed | |
| Rivets Today | 36 | 0 |
| Wing Rivets | 935 | 26 |
| Total Project Rivets | 3156 | 78 |
| Hours | 0.5 | |
| Total Hours | 331.25 |
MOST OF TODAY WAS SPENT GETTING MY HEAD AROUND WHERE I WAS UP TO BEFORE THE 6 MONTH BREAK
-DIMPLED #6 SCREW HOLES IN W822PP ACCESS PANELS THAT I’D SKIPPED EARLIER (REF 7-2 PARA 2)
-FITTED AOA BUSHINGS AND RUN AOA & PITOT LINES THROUGH WINGS

DECIDED TO RUN WIRES IN A 1/4″ BUSHING DRILLED IN THE LOWER 1/3 OF THE RIB BETWEEN THE LARGE LIGHTENING HOLE AND THE NEXT ONE AFT.
-FABRICATED DRILL TEMPLATE FOR WIRING PILOT HOLES
-DRILLED #30 WIRING PILOT HOLES

-OPENED ALL HOLES UP TO 3/8″ AND INSTALLED BUSHINGS FOR WIRING, 1/4″ ID BUSHING SHOULD BE PLENTY, IF NOT I CAN GET BIGGER LATER.
STALL WARNING
-FINAL DRILLED MAIN SPAR FOR WIRING RUN AND INSTALLED SB375-3 BUSHING
– CLECOED & DRILLED ACCESS HATCH DOUBLER TO LE SKIN
-FINAL DRILLED NUTPLATE ATTACH HOLES ON ACCESS HATCH DOUBLER
-DEBURRED ALL HOLES AND EDGES ON HATCH, DOUBLER AND LE SKIN-HATCH ATTACH HOLES
-DIMPLED #6 SCREW HOLES
-DIMPLED DOUBLER-SKIN RIVET HOLES
-DIMPLED NUTPLATE HOLES ON DOUBLER & PRIMED WITH SPRAY CAN PRIMER
-DIMPLED NUTPLATES

| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 899 | 26 |
| Total Project Rivets | 3120 | 78 |
| Hours | 4 | |
| Total Hours | 330.75 |
FINALLY BACK IN THE SHED AFTER A FEW MONTHS OFF
-STARTED BY MAKING UP A LONG DRILL TO DRILL PITOT/AOA HOLES THROUGH THE WING WALK RIBS, AFTER A LOT OF THINKING I ENDED UP JUST WELDING A PIECE OF STEEL BAR ONTO THE 3/8 DRILL BIT, AND THIS WORKED WELL

-DRILLED AOA HOLES IN WINGWALK RIBS READY FOR BUSHINGS TO BE FITTED
-ORDERED REQUIRED HARDWARE FROM VANS
Manual Reference:
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 899 | 26 |
| Total Project Rivets | 3120 | 78 |
| Hours | 1.5 | |
| Total Hours | 326.75 |
-CLEANED UP ALL PARTS WITH MEK
-CARRIED OUT CONTINUITY CHECK OF CAPACITIVE SENDER PLATES/PLUG
-CARRIED OUT FINAL CLEARANCE CHECK ON FUEL TANK BAYS
-TOOK VIDEO OF CLEARANCE CHECK – SEE VIDEO 20150420_154440_







-SEALED TERMINALS ON IB SENDER PLATE
-RUN SEALANT ALONG BAFFLE RIVET LINES ON TANK ASSY
-RUN SEALANT ALONG RIB AFT FLANGES – EXTRA SEALANT ON END RIB CORNERS
-INSTALLED T-702 BAFFLE INTO PLACE WITH A CLECO IN EVERY SKIN-BAFFLE HOLE
-RIVETED ALL RIB TOP AND BOTTOM HOLES WITH POP RIVETS IN ALL BUT END RIBS & SOLIDS IN THE END RIBS
-INSTALLED ALL T-712 Z-BRACKETS USING POP RIVETS IN CENTRE RIBS AND SOLIDS IN END RIBS
*HAD TO GRIND A FAIR BIT OFF MY POP RIVET GUN TO FIT IT ON THE Z-BARCKETS
-RIVETED ALL LENGTHWISE SKIN-BAFFLE RIVETS WITH 3.5 SOLID RIVETS

-RUN SEALANT AROUND T-708 COVER PLATE & INSTALLED ONTO TANK

AS USUAL I MADE A HELL OF A MESS BUT IT SHOULDN’T LEAK
EXCEPT FOR CLEANING UP FUEL TANK IS COMPLETE, IM GLAD THATS OVER!!
PICTURES- 1623-1642
RIVETS – INST 183 – REM 0
WING RIVETS – INST 751 – REM 25
TOTAL PROJECT RIVETS – INST 3072 – REM 78
Manual Reference: 7-7, 7-8
| Installed | Removed | |
| Rivets Today | 183 | 0 |
| Wing Rivets | 899 | 26 |
| Total Project Rivets | 3120 | 78 |
| Hours | 3 | |
| Total Hours | 325.25 |
-TIDIED UP SURFACES TO BE SEALED WITH REAR BAFFLE
-CLEANED ALL LOOSE ITEMS OUT OF TANK
-GOT ALL PARTS READY TO CLOSE TANK
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 716 | 26 |
| Total Project Rivets | 2937 | 78 |
| Hours | 1.5 | |
| Total Hours | 322.25 |
-SEALED & RIVETED IB END RIB INTO PLACE
-SEALED AND RIVETED T-405 & T-410 INTO PLACE

-RUN SEALANT AROUND T-407 RING
Manual Reference: 7-7
| Installed | Removed | |
| Rivets Today | 48 | 0 |
| Wing Rivets | 716 | 26 |
| Total Project Rivets | 2937 | 78 |
| Hours | 2 | |
| Total Hours | 320.75 |
-INSTALLED IB CAPACITIVE FUEL PLATE


-TRIAL FITTED VENT LINE, BENT IB END AS REQUIRED & CHOPPED OB END TO FIT CORRECTLY


-FABRICATED PLATE TO COVER TOOLING HOLE ON END OF OB RIB
-SEALED & RIVETED TOOLING HOLE COVER ONTO RIB & T410

*FOUND THAT RIVETING THE 410 ONTO THE RIB BOWED THE RIB MAKING IT VERY DIFFICULT TO RIVET INTO PLACE
-SEALED VENT LINE INTO CLIP WITH FUEL TANK SEALANT

-CLECOED OB END RIB INTO PLACE WITH EXTREME DIFFICULTY
-RIVETED OB END RIB INTO PLACE AND CLEANED UP
MADE A HUGE MESS BUT HOPEFULLY IT’LL SEAL OK
Manual Reference: 7-7, OP-7
| Installed | Removed | |
| Rivets Today | 53 | 0 |
| Wing Rivets | 668 | 26 |
| Total Project Rivets | 2889 | 78 |
| Hours | 4 | |
| Total Hours | 318.75 |
-CLEANED UP ALL HOLES/COUNTERSINKS
-USED TOOTHPICK WITH SEALANT UNDER THE RIVET HEADS TO INSTALL RIVETS WET
-RIVETED RIB #6 INTO PLACE
-MID WAY THROUGH COMPRESSOR STOPPED WORKING, SO BORROWED ANOTHER COMPRESSOR BUT DIDNT GET A CHANCE TO GET PICS
-SEALED SHOP HEADS
Manual Reference: 7-6, 7-7
| Installed | Removed | |
| Rivets Today | 34 | 0 |
| Wing Rivets | 615 | 25 |
| Total Project Rivets | 2836 | 78 |
| Hours | 1.5 | |
| Total Hours | 314.75 |
SEALED RIB # 6 INTO POSTION READY TO BE RIVETED
Manual Reference: 7-6, 7-7
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 581 | 25 |
| Total Project Rivets | 2802 | 78 |
| Hours | 0.5 | |
| Total Hours | 313.25 |
-FLARED LH FUEL TANK VENT LINE
-CRIMPED ALL REMAINING CAP FUEL SENSOR FITTINGS
Manual Reference: 7-6, 7-7, 7-8 OP-7
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 581 | 25 |
| Total Project Rivets | 2802 | 78 |
| Hours | 1 | |
| Total Hours | 312.75 |
-CLEANED UP ALL HOLES/COUNTERSINKS
-USED TOOTHPICK WITH SEALANT UNDER THE RIVET HEADS TO INSTALL RIVETS WET
-RIVETED RIBS 3, 4 & 5 INTO PLACE
-SEALED SHOP HEADS
-DONE FOR TODAY
Manual Reference: 7-6, 7-7
| Installed | Removed | |
| Rivets Today | 100 | 1 |
| Wing Rivets | 581 | 25 |
| Total Project Rivets | 2802 | 78 |
| Hours | 2.5 | |
| Total Hours | 311.75 |
-DECIDED TO TRY A LESS MEESY WAY TO SEAL RIBS IN, WHERE THEY ARE SEALED IN PLACE WITH ALL CLECOES THEN RIVETED THE NEXT DAY.
-SEALED RIBS 3, 4 & 5 INTO PLACE WITH ALL CLECOES

Manual Reference: 7-6, 7-7
| Installed | Removed | |
| Rivets Today | 0 | 0 |
| Wing Rivets | 481 | 24 |
| Total Project Rivets | 2702 | 77 |
| Hours | 2 | |
| Total Hours | 309.25 |
-SCREWED OB CAPACITIVE PLATE TO RIB #6 & BOLTED WIRE TO IT


-CLEANED UP SKIN WHERE RIBS WILL BE SEALED
-SEALED & RIVETED 1ST RIB INTO SKIN, COULDN’T DO ANYMORE AS THE SEALANT WAS GOING OFF
Manual Reference: 7-6, 7-7, OP-7
| Installed | Removed | |
| Rivets Today | 34 | 0 |
| Wing Rivets | 481 | 24 |
| Total Project Rivets | 2702 | 77 |
| Hours | 3.5 | |
| Total Hours | 307.25 |
-INSTALLED AND SEALED CAPACITIVE FUEL SENDER PLUG TO IB RIB


-RIVETED & SEALED FUEL CAP TO SKIN
-ATTACHED/SEALED ALL FUEL PICKUP HARDWARE TO ACCESS PANEL
Manual Reference: 7-6
RIVETS – INST 12 – REM 0
WING RIVETS – INST 555 – REM 30
TOTAL PROJECT RIVETS – INST 2770 – REM 77
Hours: 3
Total Hours: 303.75
-Removed vinyl from rivet holes on skin
-Deburred 1 wing skin
Manual Reference:
Hours: 2
Total Hours: 300.75
-Started by scuffing up the rivet lines

-Cleaned up all parts with MEK
-Decided to use PPG PR1440-B2 Sealant
-Started riveting stiffeners to skin, making a hell of a mess but its well covered
-Riveted all stiffeners to skin covering the shop head with sealant and the stiffeners under the filler cap covered by more sealant as it will be subjected to fuel flow from the filler nozzle
-Installed drain flange & had to remove it due to unsatifactory rivets
-Cleaned up drain flange area and re-riveted, made a big mess due to the sealant starting to go off
-Will scrape off excess sealant later using a nylon scraper

Manual Reference:
RIVETS – INST 84 – REM 6
WING RIVETS – INST 543 – REM 30
TOTAL PROJECT RIVETS – INST 2758 – REM 77
Hours: 1
Total Hours: 298.75
-Pilot drilled capacitive fuel sensor plug & fuel vent line holes in inboard rib

-Dimpled stiffeners
-Dimpled ribs
-Dimpled rivet holes on skin
-Deburred Screw holes on fuel tank skin
Manual Reference:
RIVETS – INST 0 – REM 0
WING RIVETS – INST 459 – REM 24
TOTAL PROJECT RIVETS – INST 2674 – REM 71
Hours: 2
Total Hours: 297.75
-Deburred ribs, baffle & stiffeners
-Marked drill holes for capacitive fuel sensor plug & fuel vent line in inboard rib
-Cut and straightened fuel vent line
-Cut capacitive fuel sensor wires to length
-Soldiered fuel sensor short wire to bulkhead plug
Manual Reference:
RIVETS – INST 0 – REM 0
WING RIVETS – INST 459 – REM 24
TOTAL PROJECT RIVETS – INST 2674 – REM 71
Hours: 2
Total Hours: 295.75
-Drilled Capacitive fuel plate to OB rib #20

-Opened rib holes up to 1/4″
-Trimmed stiffeners & plate to give required clearance
-Drilled Capacitive fuel plate to IB rib #20
-Opened rib holes up to 1/4″
-Riveted nutplates to Capacitive Plates
-Modified snap bushings to fit both capacitive fuel sensor wire and 1/4″ fuel tube.
Manual Reference:
RIVETS – INST 12 – REM 0
WING RIVETS – INST 459 – REM 24
TOTAL PROJECT RIVETS – INST 2674 – REM 71
Hours: 2
Total Hours: 293.75
-Drilled fuel tank assembly
-Drilled Fuel pickup holes to 411 panel
-Cut out 711 stiffeners which I hadn’t done previously
-Tidied up stiffeners
-Drilled Stiffeners to to skin

-Countersunk Fuel Tank skin only on baffle row of ribs

-Drilled spar attach screw holes to #19
-Fabricated T405 attach angle, I didn’t have a bandsaw or similar so I had to make do with a hacksaw, linishing belt & scotchbrite wheel


-Deburred T410 plates
-Drilled 405 plates roughly as shown in plans
-Clamped 405 & 410 Reinforcement plates on end ribs & drilled


-Drilled & Clecoed VA112 drain flange to tank, used rod end bearing to align hole in tank skin.

-Have to skip over fitting the cap assembly as I ordered the delux cap and am still waiting for it to arrive.
Manual Reference:
RIVETS – INST 0 – REM 0
WING RIVETS – INST 447 – REM 24
TOTAL PROJECT RIVETS – INST 2662 – REM 71
Hours: 6.5
Total Hours: 291.75
-AFTER CONSULTATION WITH THE SHEETMETAL GUYS AT WORK I DECIDED RATHER THAN CUT THE 703 FUEL TANK RIB ACCESS HOLE WITH A FLY CUTTER I’D JUST CHAIN DRILL AND CUT OUT.
-SO I CHAIN DRILLED AND CUT OUT THE 703 RIB ACCESS HOLE AND TIDIED IT UP

-I DRILLED THE UNCUT T411 ACCESS PANEL TO THE RIB, THEN CLECOED THE REINFORCEMENT RING & DRILLED NUTPLATE HOLES IN THE RIB

-NEXT I DEBURRED/COUNTERSUNK AND DIMPLED THE HOLES, THEN FORGETING TO ATTACH NUTPLATES STARTED RIVETING THE RING TO THE RIB
-AFTER 16 RIVETS REALIZED THAT I HAD MISSED THE NUTPLATES AND REMOVED THEM ALL AND RE RIVETED WITH THE NUTPLATES

Manual Reference:
RIVETS – INST 40 – REM 16
WING RIVETS – INST 447 – REM 24
TOTAL PROJECT RIVETS – INST 2662 – REM 71
Hours: 4
Total Hours: 285.25
-DRILLED 1/8″ HOLE IN ALL 712 ANGLES
-TRIED TO BOLT ANGLES TO THE SPAR BUT HAD SOME ISSUES WITH THE PLATENUTS LINING UP SO DECIDED TO CALL IT AND HAVE A BEER
Manual Reference: 7-5
RIVETS – INST 0 – REM 0
WING RIVETS – INST 362 – REM 6
TOTAL PROJECT RIVETS – INST 2577 – REM 5
Hours: 1
Total Hours: 273.75
-BOLTED 3 ATTACH “Z” BRACKETS TO SPAR – NOT ROOT BRACKET AS I NEED A VERY THIN WALLED SOCKET TO DO UP BOLTS.
-CLECOS ARRIVED SO CLECOED FUEL TANK TOGETHER FULLY
Manual Reference:
RIVETS – INST 0 – REM 0
WING RIVETS – INST 407 – REM 8
TOTAL PROJECT RIVETS – INST 2622 – REM 55
Hours: 2
Total Hours: 279.25
-RIVETED 2 OF THE FUEL TANK ROOT NUTPLATES TO THE MAIN SPAR
–COULDN’T GET ACCESS FOR THE LAST NUTPLATE SO DECIDED TO POP RIVET THE LAST ONE ON
-BOLTED 3 OF THE Z BRACKETS TO THE SPAR
Manual Reference:
RIVETS – INST 4 – REM 0
WING RIVETS – INST 407 – REM 8
TOTAL PROJECT RIVETS – INST 2622 – REM 55
Hours: 1
Total Hours: 277.25
AFTER HAVING ISSUES WITH ATTACHING THE FUEL TANK “Z” BRACKETS TO THE SPAR I DECIDED TO FOLLOW THE RECOMMENDED “CHECKOWAY” OR “ALTERNATIVE” METHOD, I SCRAPPED MY OLD Z BRACKETS ORDERED MORE AND STARTED.
-STARTED BY ASSEMBLING THE FUEL TANK ASSY WITH CLECOES, I DIDN’T HAVE ANY ISSUES WITH THIS, I FOUND THE EASIEST WAY WAS TO CLECO THE TOP ROW OF THE SKIN TO THE RIBS THEN PUSH THE ASSY TIGHTLY INTO THE STAND AND THE HOLES WERE PRETTY CLOSE TO LINING UP, THEY ONLY NEEDED A BIT OF A PUSH TO LINE UP AND CLECO
-MARKED THE CENTRELINES ON THE Z BRACKETS AND DRILLED THE CENTREMOST 3/16″ HOLE, I READ AROUND AND DIDN’T BOTHER OFSETTING THE LINES AS SOME HAD SUGGESTED.
-BOLTED BRACKETS TO THE SPAR, BACK DRILLED THE NEXT HOLE, PUT A BOLT THROUGH THE SECOND HOLE AND DRILLED THE LAST HOLE
-NEXT I NUMBERED AND REMOVED ALL THE BRACKETS, AND DEBURRED, DRILLED AND RIVETED PLATENUTS TO ALL BUT THE ROOT BRACKET, AND STARTED TO RIVET THE ROOT PLATENUTS TO THE SPAR
Manual Reference: DFD-0021
RIVETS – INST 41 – REM 2
WING RIVETS – INST 403 – REM 8
TOTAL PROJECT RIVETS – INST 2618 – REM 55
Hours: 2.5
Total Hours: 276.25
-DRILLED AND TAPPED PITOT TUBE/MAST

-MATCH REAMED LEADING EDGE ASSY.
-ENLARGED TIEDOWN HOLE IN SKIN TO 7/16″, THE HOLE ENDED UP NICE AND CENTRAL ON THE TIEDOWN ASSY

-SUMMER’S STARTING TO HIT SO ITS GETTING HARD TO SPEND EXTENDED PERIODS OF TIME IN THE SHED WITH IT BEING OVER 40 DEGREES C (104 DEGREES F) INSIDE

Manual Reference: 7-5
RIVETS – INST 0 – REM 0
WING RIVETS – INST 326 – REM 6
TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 1.5
Total Hours: 270.25
-MARKED VERTICAL CENTRELINE ON T-712 TANK ATTACH ANGLES
-MARKED LENGTHWAYS CENTRE
-DRILLED 6x 712 CENTRE FLANGES TO #12
-CLECOED ANGLES TO REAR OF SPAR

-MATCH DRILLED REMAINING TANK ATTACH HOLES TO ANGLE
-FABRICATED NUTPLATE JIG
-DRILLED NUTPLATE HOLES TO 712 ANGLES
-COUNTERSUNK ANGLE & RIVETED NUTPLATES TO ANGLE

Manual Reference: 7-5
RIVETS – INST 36 – REM 0
WING RIVETS – INST 362 – REM 6
TOTAL PROJECT RIVETS – INST 2577 – REM 5
Hours: 2.5
Total Hours: 272.75
-CLECOED LEADING EDGE ASSY TO SPAR
-DIMPLED UNDRILLED W-408 RIB AND SLID INTO PLACE ON THE IB END OF THE ASSY
-DRILLED REAR FLANGE THROUGH SPAR
-SLID TANK JOINT PLATE IN BETWEEN RIB AND SKIN AND DRILLED.
Manual Reference: 7-4, 7-5
RIVETS – INST 0 – REM 0
WING RIVETS – INST 326 – REM 6
TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 1
Total Hours: 268.75
-MATCH REAMED TOP SKINS TO SKELETON
-MATCH REAMED BOTTOM SKINS TO SKELETON
-DREW TIE DOWN LINES ON LOWER SKIN
-REMOVED BOTTOM SKINS
-REMOVED VINYL FROM INSIDE OF W-701 LEADING EDGE SKIN
-CLECOED LEADING EDGE ASSY TOGETHER
RIVETS – INST 0 – REM 0
WING RIVETS – INST 326 – REM 6
TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 3
Total Hours: 267.75
-ASSEMBLED THE LEADING EDGE CRADLE AS PER THE MANUAL
Manual Reference:
RIVETS – INST 0 – REM 0
WING RIVETS – INST 326 – REM 6
TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 1
Total Hours: 264.75
-CUT BOTH WING WALK DOUBLERS TO SIZE
-DRILLED SKIN TO DOUBLER

-SECURED MAIN SPAR INTO STAND
-TAPPED TIE DOWN ASSY
-FITTED TIE DOWN ASSY/ AILERON BELLCRANK BRACKETS WITH CENTER FOUR BOLTS AND TORQUED
-FITTED UPPER SKINS TO SKELETON (NOTE: I DECIDED NOT TO DO SINGLE PIECE UPPER WING SKINS WHEN I RANG OUR LOCAL ALUMINIUM SUPPLIER AND WAS QUOTED $380 PER SHEET)
Manual Reference: 7-4
RIVETS – INST 0 – REM 0
WING RIVETS – INST 326 – REM 6
TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 3
Total Hours: 263.75
-FITTED MY SAFEAIR1 PITOT MAST TO THE LOWER SKIN AS PER INSTRUCTION,
THE TEMPLATE MOVED AND MY CUTOUT DIDN’T COME OUT AS NICE AS IT COULD BUT IT’S ACCEPTABLE AND IT’LL JUST NEED A TIDY UP LATER TO COSMETICALLY MAKE IT LOOK NICE.
-ALSO THE FWD AREA OF THE BRACKET NEEDS A TRIM SO AS NOT TO INTERFERE WITH FWD SKIN RIVETS.
Manual Reference:
RIVETS – INST 0 – REM 0
WING RIVETS – INST 326 – REM 6
TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 1
Total Hours: 260.75
-FINISHED RIVETING MAIN RIBS TO FWD SPAR

-SKIPPED FITTING TOP SKINS FOR NOW AS I AM PLANNING 1 PIECE SKIN, BUT CLECOED LWR SKIN TO SKELETON, MY WRISTS WERE STUFFED AFTER CLECOING SO I LEFT THE DRILLING FOR NEXT TIME
*THE MATCHED HOLE WINGS ARE FITTING TOGETHER AWESOME, THE LWR SKIN FIT ON WITH NO DIFFICULTY AT ALL
Manual Reference: 7-3, 7-4
RIVETS – INST 58 – REM 3
WING RIVETS – INST 326 – REM 6
TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 3
Total Hours: 259.75
-BOLTED OUTBOARD MOUNTING BRACKET TO RIB
-SET UP JACK TO REMOVE SAG, I WAS AMAZED AT HOW MUCH SAG THERE IS WITHOUT SKIN ON, AROUND 5/16″
Manual Reference:
RIVETS – INST 0 – REM 0
WING RIVETS – INST 268 – REM 1
TOTAL PROJECT RIVETS – INST 2483 – REM 50
Hours: 1
Total Hours: 256.75
RIVETED 2ND/3RD RIBS FROM OUTBOARD WITH SQUEEZER
CAN’T DO THE REST TILL I HAVE SOMEONE TO BUCK RIVETS WITH ME
Manual Reference: 7-3
RIVETS – INST 10 – REM 0
WING RIVETS – INST 268 – REM 1
TOTAL PROJECT RIVETS – INST 2483 – REM 50
Hours: 1
Total Hours: 255.75
-RIVETED REAR SPAR ASSY TOGETHER

-CLECOED RIBS & REAR SPAR ASSY TO MAIN SPAR
-RIVETED REAR SPAR ASSY TO RIBS
Manual Reference: 7-2, 7-3
RIVETS – INST 102 – REM 1
WING RIVETS – INST 258 – REM 1
TOTAL PROJECT RIVETS – INST 2473 – REM 50
Hours: 3
Total Hours: 254.75
-ASSEMBLED TIE DOWN ASSY

-COUNTERSUNK REQUIRED REAR SPAR COMPONENTS
-ALUMIPREPPED, ALODINED & PRIMED RIBS, REAR SPAR & REAR SPAR ASSY COMPONENTS
-STARTED USING A BOEING BMS 10-11 SPEC PRIMER

Manual Reference: 7-2, 7-3
RIVETS – INST 8 – REM 0
WING RIVETS – INST 156 – REM 0
TOTAL PROJECT RIVETS – INST 2371 – REM 49
Hours: 4
Total Hours: 251.75
SPENT A FEW HOURS TODAY WHILE I CAN’T PROGRESS WITHOUT PRIMER PLANNING HOW TO MODIFY THE UPPER WING SO AS TO HAVE A SINGLE PIECE MAIN SKIN INSTEAD OF THE SUPPLIED TWO PIECE SKIN,
STARTED WRITING A MOD REPORT FOR MY RECORDS, MOD-002
(Ultimately this turned out to be too expensive and not worthwhile so I scrapped the idea)
Manual Reference:
Hours: 1.5
Total Hours: 247.75
-CLECOED MAIN RIBS TO FRONT AND REAR SPARS
NOTE: REAR SPAR HASN’T BEEN PRIMED OR RIVETED YET SO I ATTACHED EXTRA CLECOES INTO REAR SPAR ASSY TO MAKE SURE EVERYTHING IS IN PERFECT ALIGNMENT

-DRILLED MAIN RIBS TO FRONT AND REAR SPARS

-DRILLED 2 NEW HOLES IN 711 WING WALK RIBS THROUGH REAR SPAR AS REQ
-DISSASSEMBLED WING ASSY
-TRIMMED REAR SPAR REINFORCEMENT PLATES AS REQD, FOUND IT EASY TO MEASURE UP/MARK, THEN PRINT A FULL SIZE TRIM DETAIL OFF DWG 38 AND LAY UNDER TO CHECK MEASUREMENTS, THIS WORKED WELL AND MADE IT EASY, MY PURCHASED CD PLANS FROM VANS ALREADY COMING IN HANDY.

-NOW THAT TECHNICAL WORK IS DONE I GRABBED A BEER AND DEBURRED HOLES ON MAIN SPAR, REAR SPAR, REINFORCEMENT PLATES AND RIBS 
Manual Reference: 7-2, 7-3
RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49
Hours: 4
Total Hours: 246.25
-TRIMMED AEX BAR TO SIZE TO MAKE W-731
-DRILLED MATCH HOLE ON 731
-CLAMPED 731 BAR & 726 SPACERS TO SPAR ALIGNED AND BACKDRILLED

-DRILLED NUTPLATES TO ASSY & CSUNK SPACER END

-DEBURRED AL LH WING MAIN RIB LIGHTNING HOLES
-DEBURRED/DIMPLED REAR SPAR UPPER FLANGE HOLES BEHIND REINFORCEMENT FORK
-MARKED 707D READY FOR TRIMMING

Manual Reference: 7-2
RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49
Hours: 2.5
Total Hours: 242.25
-EDGE DEBURRED AND FLUTED ALL MAIN WING RIBS
-ONLY LIGHTNING HOLES TO GO
Manual Reference: 7-2, 7-3
RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 4
Hours: 8
Total Hours: 239.75
-FININSHED DEBURRING AND FLUTING ALL NOSE RIBS
-DRILLED REAR SPAR UPPER FLANGE HOLES TO #40 FOR LENGTH OF REINFORCEMENT FORK READY TO DEBURR/DIMPLE
-SORTED MAIN WING RIBS READY TO DEBURR LIGHTNING HOLES & FLUTE
Manual Reference: 7-2, 7-3
RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49
Hours: 1
Total Hours: 231.75
-SPENT A MONTH AWAY ON HOLIDAYS, SO ON RETURN I DECIDED TO FINISH THE PAINFULL JOB OF FLANGE DEBURRING THE NOSE RIBS
-OVER A PERIOD OF ABOUT A MONTH FINISHED DEBURRING THE NOSE RIB FWD FLANGE EDGES AT WORK IN MY FREE TIME.
-ALL RIB LIGHTNING HOLES STILL TO BE DEBURRED
-FLUTED ALL NOSE RIBS
Manual Reference: 7-2, 7-3
RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49
Hours: 8
Total Hours: 230.75
-CONTINUED EDGE DEBURRING OF WING RIBS
-FINISHED EDGE DEBURRING ALL RIB FLANGES, NOT INCLUDING CORNERS AND TIGHT SPOTS

-COULDN’T HANDLE DEBURRING RIBS ANY MORE SO WENT LOOKING AND FOUND MISSING W-707G REAR SPAR REINFORCEMENT FORKS
-CLECOED/DRILLED W-707G & D FORK AND REINFORCEMENT PLATE TO REAR SPAR & EDGE /HOLE DEBURRED
Manual Reference: 7-2, 7-3
RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49
Hours: 1.5
Total Hours: 222.75
-OPENED UP REAR SPAR DOUBLER HOLE
Manual Reference: 7-3
RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49
Hours: 0.5
Total Hours: 221.25
-EDGE DEBURRED SPAR & REINFORCE PLATES EXCEPT 707G REINFORCE FORK AS I CAN’T FIND IT
-CLAMPED 707 E/F REINFORCE PLATES TO SPAR, DRILLED/CLECOED & STARTED CUTTING AILERON PUSHROD HOLE

-HOLE DEBURRED SPAR AT 707E & F POSITIONS & HOLE DEBURRED 707 E& F
-HAD TO SKIP CUTTING 707D&G AS I CANT FIND THE G REINFORCEMENT PLATES
Manual Reference: 7-2
RIVETS – INST 0 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49
Hours: 2
Total Hours: 220.75
-DRILLED 822 ACCESS PLATES TO #28, BUT DIDN’T HAVE DIMPLE DIE TO DIMPLE FOR A # 6 SCREW SO I LEFT THAT FOR NOW
-DRILLED, COUNTERSUNK & RIVETED CENTRE SECTION NUTPLATES ON, THE PLANS CALL OUT FOR YOU TO COUNTERSINK THE W706C DOUBLER PLATE SO THE RIVET HEAD SITS ON THE AFT SIDE OF THE SPAR, AFTER TRYING TO FIND THIS DOUBLER PLATE IN MY PARTS/PLANS AND SEARCHING THE WEB I FOUND THAT IT IS ALREADY RIVETED ON TO THE SPAR FROM FACTORY, AND COULD BE NOTED A BIT BETTER.

-STARTED FABRICATING W-726 TIE DOWN SPACERS
Manual Reference: 7-2
RIVETS – INST 4 – REM 0
WING RIVETS – INST 148 – REM 0
TOTAL PROJECT RIVETS – INST 2363 – REM 49
Hours: 2
Total Hours: 218.75
-DRILLED, DEBURRED NUTPLATE HOLES ON LOWER FLANGE
-RIVETED THE 30 PLATENUTS ON THE LOWER FLANGE
-COUNTERSUNK SCREW HOLES ON UPPER FLANGE
-DRILLED, DEBURRED & RIVETED ACCESS PLATE NUTPLATES ONTO SPAR
-COUNTERSUNK SCREW HOLE FOR ACCESS PLATES
Manual Reference: 7-1, 7-2
RIVETS – INST 84 – REM 0
WING RIVETS – INST 144 – REM 0
TOTAL PROJECT RIVETS – INST 2359 – REM 49
Hours: 2
Total Hours: 216.75
-DRILLED, DEBURRED NUTPLATE HOLES ON UPPER FLANGE
-RIVETED THE 30 PLATENUTS ON THE UPPER FLANGE
-COUNTERSUNK SCREW HOLES ON UPPER FLANGE
-THE FIRST FEW DIDN’T COME OUT AS NICE AS I WOULD HAVE LIKED, BUT I FOUND THE SLOWER I FEED THE COUNTERSINK IN THE NICER THE HOLE COMES OUT

RIVETS – INST 60 – REM 0
WING RIVETS – INST 60 – REM 0
TOTAL PROJECT RIVETS – INST 2275 – REM 49
Manual Reference: 7-1, 7-2
Hours: 1
Total Hours: 214.75
-MOUNTED LH SPAR INTO STAND
-DRILLED & COUNTERSUNK NUTPLATE ATTACH HOLES

WING RIVETS – INST 0 – REM 0
TOTAL PROJECT RIVETS – INST 2215 – REM 49
Manual Reference: 7-1
Hours: 1
Total Hours: 213.75
***EMPENNAGE COMPLETE***
EXCEPTIONS/NOTES
-ELEVATOR COUNTERWEIGHTS NOT SECURED, WAITING ON HARDWARE
-TRIM TAB HINGE PIN, LONGER PIN NEEDS TO BE INSTALLED & LOCKWIRED
-ELECTRIC TRIM SYSTEM NEEDS TO BE ATTACHED/ADJUSTED
-ROD END BEARINGS IN RUDDER REQUIRE LENGTH SETTING
-NO SWING, ALIGNMENT CHECKS CARRIED OUT
-HORI STAB CENTRE BEARING TO ELEV HORNS NOT DRILLED
-NO BOLTS TORQUED


EMPENNAGE TOTAL RIVETS – INST 2215 – REM 49
TOTAL PROJECT RIVETS – INST 2215 – REM 49
Manual Reference:
Hours: 1
Total Hours: 212.75
-ROLLED LH ELEVATOR LEADING EDGE & RIVETED

-INSTALLED ROD END BEARINGS PER PLANS
-MADE SLIGHT BEND IN TRIM TAB SKIN AS PER PLANS FOR CLEARANCE
-TEMP FITTED TO HORIZONTAL STAB & STARTED TRIMMING REQD MATERIAL FOR FIT

***LH ELEVATOR COMPLETE***
TOTAL PROJECT RIVETS – INST 2215 – REM 49
Manual Reference:
Hours: 2.5
Total Hours: 211.75
-RIVETED HINGE TO SPAR/SKIN OF TRIM TAB
-RIVETED HORN & RIBS TO TRIM TAB

-HAD INTERFERENCE ON IB RIB FROM HORN RIVET SO REMOVED MATERIAL TO ALLOW SKIN TO SIT FLUSH
-TOUCHED UP ALL BARE METAL EDGES WITH ALODINE 1132 PEN
-RIVETED FWD SECTION OF HINGE TO ELEVATOR SPAR
***TRIM TAB NOW COMPLETE***
RIVETS – INST 58 – REM 7
TOTAL PROJECT RIVETS – INST 2215 – REM 49
Manual Reference:
Hours: 2.5
Total Hours: 209.25
-CLECOED BOTTOM FLANGE OF SPAR TO SKIN & HORNS/RIBS
-RIVETED SKIN TO LOWER SPAR FLANGE

-REALIZED THAT I HADN’T CUT THE OUTBOARD END OF THE TAB STRAIGHT, SO TRIMMED TO 90DEG FROM THE SPAR & TRIMMED RIB ACCORDINGLY, EDGE MARGIN IS COMPROMISED ON THE TAB SKIN, WILL CONTINUE AND CONTACT VANS/SAAA TECHNICAL COUNCILLOR TO FIGURE OUT A COURSE OF ACTION. (SEE DFD-0018)

-CLAMPED STRAIGHT EDGE/ PIECE OF TIMBER EITHER SIDE OF ELEVATOR & CLAMPED 721 HINGE & TAB TO ELEVATOR

-FIDDLED AND TIDIED EDGES FOR AGES TRYING TO GET THE EDGES TO THE RIGHT DISTANCE (3/32″) AND TRIMMED ACCORDINGLY TO MAKE EDGE LOOK GOOD.
-MATCH DRILLED TRIM TAB TO ELEVATOR
-MARKED IB EDGE ON HINGE & MARKED STRAIGHT EDGE ON TAB FOR TRIMMING
-TRIMMED TAB EDGES
-TREATED ALL BARE METAL EDGES AND MATING SURFACES WITH ALODINE 1132 PEN
-RIVETED RIB TO ELEVATOR

RIVETS – INST 20 – REM 0
TOTAL PROJECT RIVETS – INST 2157 – REM 42
Manual Reference:
Hours: 3.5
Total Hours: 206.75
PREPPED & PRIMED ELEVATOR TRIM TAB COMPOMNENTS
TOTAL PROJECT RIVETS – INST 2137 – REM 42
Manual Reference:
Hours: 1.5
Total Hours: 203.25
-DRILLED NEW RIBS TO TAB & ELEVATOR
-DEBURRED & DIMPLED/COUNTERSUNK ALL TRIM TAB COMPONENTS

TOTAL PROJECT RIVETS – INST 2137 – REM 42
Manual Reference:
Hours: 2.5
Total Hours: 201.75
-REMOVED TAB MATERIAL FROM ELEVATOR TRIM TAB & FABRICATED RIBS TO REPLACE (SEE MOD-001)

-CLAMPED HORNS 618 & 616 TOGETHER & MATCH DRILLED TO SKIN

-MEASURED & CLAMPED HINGE TO TAB

-MATCH DRILLED LOWER SPAR FLANGE TO SKIN
-MATCH DRILLED HINGE/SKIN TO UPPER SPAR FLANGE

TOTAL PROJECT RIVETS – INST 2137 – REM 42
Manual Reference:
Hours: 3
Total Hours: 199.25
-MEASURED ELECTRIC TRIM BRACKETS TO PANEL & CHANGED AS REQUIRED DUE TO MIRROR IMAGE ISSUES WITH THE PLANS
-DRILLED BRACKETS TO PANEL

-ROLLED RH ELEVATOR LEADING EDGE
-FITTED RH ELEVATOR TO HORIZ STAB & REMOVED REQUIRED MATERIAL
TOTAL PROJECT RIVETS – INST 2137 – REM 42
Manual Reference:
Hours: 4
Total Hours: 196.25
-CUT OFF ELEVATOR TRIM OPENING TABS & FABRICATED RIB (SEE MOD-001)

-RIVETED PLATENUTS/ REINFORCEMENT PLATES TO SPAR
-RIVETED 705 ROOT RIB TO SPAR

-RIVETED SKIN TO 713 COUNTERBALANCE SKIN
-INSERTED SKELETON INTO THE SKIN
-RIVETED SKIN TO SKELETON
-RIVETED LOWER FLANGE OF TAB SPAR

RIVETS – INST 175 – REM 3
TOTAL PROJECT RIVETS – INST 2137 – REM 42
Manual Reference:
Hours: 4
Total Hours: 192.25
PRIMED LH ELEVATOR COMPONENTS
TOTAL PROJECT RIVETS – INST 1939 – REM 39
Manual Reference:
Hours: 2
Total Hours: 188.25
-DEBURRED, DIMPLED & COUNTERSUNK LH ELEVATOR COMPONENTS

TOTAL PROJECT RIVETS – INST 1939 – REM 39
Manual Reference:
Hours: 4.5
Total Hours: 186.25
-NEW JKL STIFFENERS ARRIVED SO I TRIMMED, DRILLED, DEBURRED & PRIMED

-DEBURRED/DIMPLED SKIN
-BACKRIVETED STIFFENERS ON
TOTAL PROJECT RIVETS – INST 1939 – REM 39
Manual Reference:
Hours: 1.5
Total Hours: 181.75
-CLECOED/DRILLED 610/611 PLATES TO SPAR
-FLUTED/DEBURRED 704/5 TIP RIBS THEN DRILLED TO SPAR
-RIVETED STIFFENERS TO LHS SKIN EXCEPT UPPER JKL IN TRANSIT FROM VANS

-MODIFIED DIMPLE DIE, DIMPLED PLATENUTS & RIVETED TO 615 PLATE

-DRILLED COUNTEBALANCE TO TO RIB/SKIN ASSY
-CLECOED SKELETON STRUCTURE TOGETHER
-FINAL DRILLED ROOT RIB & HORN TO STRUCTURE
RIVETS – INST 112 – REM 0
TOTAL PROJECT RIVETS – INST 1939 – REM 39
Manual Reference:
Hours: 2.75
Total Hours: 179.75
-REMOVED FUSE/WING/FINISHING BOXES FROM SHED
-REMOVED WING COMPONENTS FROM BOXES & STACKED
-TIDIED SHED AND REPLACED CARPET
-MADE ROOM FOR WING STAND
Manual Reference:
Hours: 6
Total Hours: 177
-RIVETED 703 RIB TO 704 RIB
-RIVETED 611/610 STIFFENERS & NUTPLATES TO SPAR
-RIVETED INBOARD RIB TO SPAR
-RIVETED 703-704 RIBS TO SPAR
-RIVETED HORN TO SPAR/RIB
-RIVETED COUNTERBALANCE SKIN TO SKIN
-CLECOED SKIN TO STRUCTURE & RIVETED

RH ELEVATOR NOW COMPLETE

NOTE: COUNTERBALANCE SCREWS NOT TORQUED/NEED REPLACEMENT
Manual Reference:
Hours: 3.75
Total Hours: 171
DOUBLE FLUSH RIVETED RUDDER TRAILING EDGE, CAME UP GOOD

ROLLED LEADING EDGE & RIVETED, GOT A SMALL CREASE, WITHIN LIMITS

RUDDER NOW COMPLETE
PHOTOS 70, 75-78
Manual Reference:
Hours: 1.5
Total Hours: 163.15
-PREPPED/ PRIMED LH ELEVATOR SKIN/STIFFENERS & 615 TRIM PLATE

-PREPPED/PRIMED RH ELEVATOR REMAINING PARTS
Manual Reference:
Hours: 4.1
Total Hours: 167.25
DEBURRED SKIN/STIFFENERS/TRIM REINFORCEMENT PLATES
DIMPLED 615PP TRIM PLATE
Manual Reference:
Hours: 4.2
Total Hours: 161.65
DEBURRED ALL RH ELEVATOR PARTS
COUNTERSUNK 714 COUNTERBALANCE & DIMPLED 713 COUNTERBALANCE SKIN
COUNTERSUNK 702 ON 702/709 POINT, HAD ISSUES SEE DFD-14
-BEVELED 713 COUNTERBALANCE SKIN
DIMPLED ALL COMPONENTS OF RHS

LHS
TRIMMED/DEBURRED LH ELEVATOR STIFFENERS EXCEPT 3xJKL I’M WAITING FOR
CLECOED/MATCH DRILLED LH ELEVATOR STIFFENERS & 616PP PLATE TO SKIN EXCEPT UPPER SIDE JKL I’M WAITING FOR
Manual Reference:
Hours: 3.5
Total Hours: 157.45
ASSEMBLE BENDER & BENT TRAILING EDGE
CLECOED SKIN TO UNDERSTRUCTURE
CLECOED HORN TO STRUCTURE
19/02/2014
DRILLED HORN TO STRUCTURE
DRILLED SKIN TO UNDERSTRUCTURE
DISSASSEMBLED ELEVATOR
Manual Reference:
Hours: 1.5
Total Hours: 153.95
SUNK BAR INTO BENCH TO MAKE BACK RIVETING EASIER

RIVETED STIFFENERS TO RHS SKIN
Manual Reference:
Hours: 2
Total Hours: 152.45
PREPPED AND PRIMED STIFFENERS AND SKIN
Manual Reference:
Hours: 2
Total Hours: 150.45
DEBURRED HOLES ON SKIN & STIFFENER
DIMPLED HOLES ON SKIN AND STIFFENERS

DRILLED 610 & 611 REINFORCEMENT PLATED TO SPAR
EDGE DEBURRED 702 SPAR, 703/4 RIBS, 610/611 REINFORCEMENT PLATES & 713 SKIN
FLUTED 703/4 RIBS
CLECOED/DRILLED 703-704 RIBS, DRILLED TO 702 SPAR
ASSEMBLED CBALANCE/RIB ASSY & DRILLED E714 CBALANCE TO ASSEMBLY

REMOVED 714 CBALANCE AND ATTACHED ASSY TO SPAR
CLECOED/DRILLED 709 ROOT RIB TO SPAR
Manual Reference:
Hours: 2
Total Hours: 148.45
DRILLED STIFFENERS TO RH SKIN
REMOVED VINYL AROUND HOLES
Manual Reference:
Hours: 1.5
Total Hours: 146.45
CUT/TRIMMED STIFFENERS
MADE 3 JKL STIFFENERS BUT UNDERTRIMMED THE OTHER 3
STARTED DEBURRING STIFFENERS
Manual Reference:
Hours: 1.5
Total Hours: 143.45
CLECOED & RIVETED NEW TIP RIB IN

CLECOED & RIVETED REAR SPAR ON
HORIZONTAL STAB NOW COMPLETE
Manual Reference:
Hours: 1.5
Total Hours: 141.95
DRILLED, DEBURRED, DIMPLED & PRIMED NEW HS706
Manual Reference:
Hours: 0.5
Total Hours: 140.45
Riveted HS707 to top side of the skin then bottom side

Clecoed Spar assy on then blind riveted 404-702-405

Installed spar to tip rib rivets
Riveted Assy together

Repeated for RHS
While Riveteing RH HS706 to spar, rib became damaged, removed it pending replacement
Manual Reference:
Hours: 5
Total Hours: 139.95
Removed Angle & Cleaned Sealant off edges & out of dimples

Taped Rivets in
Flipped rudder and weighted down

half set 4 rivets, didn’t sit flush because of bowed back rivet plate
Manual Reference:
Hours: 0.7
Total Hours: 134.95
Bonded & Clecoed Trailing Edge
Manual Reference:
Hours: 1
Total Hours: 134.25
Riveted Reinforcement plates & platenuts to spar
Riveted 904 & associated parts – installed alternate LP4-3 in R405PD – R710 IAW Drwg6 R1
Manual Reference:
Hours: 2
Total Hours: 127.95
Riveted Counterbalance skin to rib
Had issued see DfD12
Manual Reference:
Hours: 1.8
Total Hours: 129.75
Prepped, Alumiprepped, Alodined & Primed Rudder stiffeners
Manual Reference:
Hours: 2.5
Total Hours: 111.55
Dimpled all parts & countersunk AEX Wedge
Drilled, Deburred & Dimpled to 1/8” upper aft 3 holes on skins
Manual Reference:
Hours: 3
Total Hours: 123.45
Fabricated R918 Bottom Strips

Disassembled Rudder & hole deburred all components
Edge deburred complete assembly
Manual Reference:
Hours: 3.5
Total Hours: 120.45
-Fabricated R-917 Shim
-Bolted R-405PD horn to spar & final drilled top holes
-Clecoed horn to lwr rib & radiussed horn to fit
-Clecoed horn and rib to spar then slipped shim in and drilled to #30

-Clecoed reinforcement plates to spar and match reamed
-Fluted R-903 & R-912 Ribs
-Clecoed 903 & 912 to spar and match reamed
-Clecoed R-913 counterbalance skin to 903 & 912 counterbalance ribs & match reamed

-Clecoed Skin to Skeleton assy ready to be final drilled
Manual Reference:
Hours: 2
Total Hours: 115.65
Clecoed bottom rib to spar & enlarged .125″ hole to 3/8″
Manual Reference:
Hours: 0.1
Total Hours: 113.65
Back Riveted rudder stiffeners to skins

Today [234 Driven – 2 Removed]
Total [703 Driven – 13 Removed]
Manual Reference:
Hours: 2
Total Hours: 113.55
-Visited SAAA Technical Counsellor to check Vertical Stab
“Presented vertical stabiliser before closing up, Good quality of workmanship.”
-Riveted Rear Spar onto Vertical Stab
-VERTICAL STABILISER NOW COMPLETE
Today [72 Driven – 0 Removed]
Total [469 Driven – 11 Removed]
Manual Reference:
Hours: 0.5
Total Hours: 109.05
Flattened Dimple
Removed damaged material

Cleaned & Deburred
Applied JB Weld

Wasnt happy with the results so added a new hole between damaged and next hole.
Filled Damaged hole with jb weld and primed skin
Manual Reference: DfD-11
Hours: 2.5
Total Hours: 108.55
-Finished edge deburring stiffeners
-Dimpled stiffeners

-Dimpled LH skin – Misdimpled one hole (refer DfD-11)
Manual Reference:
Hours: 1.5
Total Hours: 106.05
Finished hole deburring skin @ stiffener locations
Manual Reference:
Hours: 0.5
Total Hours: 104.55
-Match drilled stiffeners to rudder
-hole deburred stiffeners
Manual Reference:
Hours: 1.5
Total Hours: 104.05
-Trimmed all 915 Stiffeners for LH side

-Started Trimming 915 stiffeners for RH side
Manual Reference:
Hours: 1.35
Total Hours: 102.05
Riveted skin on
Riveted all ribs
Had Issues with lwr 702-704-801 Intersection, see DfD-0009 
Manual Reference:
Hours: 2
Total Hours: 100.7
Clecoed & Riveted Rear Spar

Riveted Ribs to Fwd Spar
Clecoed Skin to Skeleton
Manual Reference:
Hours: 2
Total Hours: 98.7
Completed Prep & Priming of Vertical Stab
Manual Reference:
Hours: 2
Total Hours: 96.7
Completed Repair of VS706 IAW DfD-0008
Manual Reference:
Hours: 2
Total Hours: 94.7
Prepped (Alumiprep & Alodine) & Primed all ribs excluding VS-706
Prepped & Primed Fwd Spar
Manual Reference:
Hours: 1.5
Total Hours: 92.7
Attached Skin

Final Drilled all holes
Dissassembled & Deburred complete stab
Dimpled all understructure – had an issue with one dimple on VS706 – see DfD-0008
Started Dimpling skin
Manual Reference:
Hours: 4
Total Hours: 91.2
Clecoed Stab together
Manual Reference:
Hours: 0.5
Total Hours: 87.2
Match Drilled VS410
Manual Reference:
Hours: 1.5
Total Hours: 86.7
Finished Dimpling & started repair on holes
Refer DfD-0009 – After consulting with Vans, TC & LAME Friends I decided to start the VS again and use the old one as practise
Manual Reference:
Hours: 1.4
Total Hours: 85.2
Countersunk Vs808 rear spar stiffener & Dimpled spars & Ribs

Started Dimpling skin but had 2 misdimpling mishaps

See DfD-0006 & DfD-0007
N/A Refer to DfD-0010
Manual Reference:
Hours: 1.5
Total Hours: 83.8
Hole Deburred Skeleton
N/A Refer to DfD-0010
Manual Reference:
Hours: 2.5
Total Hours: 80.3
Today I:
Disassembled Stab & Removed Vinyl from Parts & Rivet Lines on Skin
Manual Reference:
Hours: 1.5
Total Hours: 77.8
Today I:
-Clecoed the VS808PP Rear Spar Doubler to the VS803PP Rear Spar Channel, then clecoed the VS410PP, 411PP & 412PP Hinge Brackets to the Rear Spar Assy.

-Match Drilled & Reamed Upper HS410 to the Spar Assy, but I left the Lower HS410 as the lower undrilled holes are meant to be drilled in place with the fuse.
-Fluted & edge deburred Ribs
-Clecoed Skeleton together
-Match Reamed Hinge Brackets & Ribs to the Spars
-Clecoed Skin to Skeleton

-Match Reamed all attaching holes from Skin to Skeleton
N/A Refer to DfD-0010
Manual Reference:
Hours: 3
Total Hours: 76.3
Today I
-Installed LH HS404 & had to install one -5 Rivet as the hole was oversized from a bad rivet removal.
Refer DfD-0005
Manual Reference:
Hours: 1
Total Hours: 73.3
Today I
Installed BACR15BB5AD6.5 rivet into the enlarged hole & installed both HS405’s & the RH HS404.
Refer DfD-0002

Blended minor surface damage out of LH HS404 flange then alodined & primed
Refer DfD-0004

Clecoed HS707 to the LH skin & installed 1 rivet
Manual Reference: HS/RIVET
Hours: 2
Total Hours: 72.3
Today I drilled the damaged hole to 5/32″ the removed HS405 & Deburred all parts.
Manual Reference: HS/RIVET
Hours: 1
Total Hours: 70.3
Today I
Pinched my finger in the Pneumatic squeezer while trying to remove the rivet squeeze heads.

Had a better look at the elongated hole in HS710-702-405 and sent of a pic to Van’s, so i’ll wait and see what they say.

Touched up chipped areas of primer
Manual Reference: HS/RIVET/
Hours: 0.75
Total Hours: 69.3
After Contacting other builders & looking at other builders logs I decided to rivet with the manufactured head forwards
I finished riveting HS710/HS714 to HS702, although i had to drive the rivets for HS714 with the gun as the squeezer wouldnt fit, but i was very happy with my first gun driven rivets.
I realized after doing those rivets that i was meant to leave the rivets out where the HS405/405 ribs attach to the spar, so i removed the four attach rivets successfully.
Next I installed both HS405 & one HS404, but I wasn’t happy with 2 of the rivets so I removed them, but one of the HS405 holes become elongated when i removed it, so i decided to leave it for the afternoon.
Manual Reference: HS/Rivet/S5-6
Hours: 2
Total Hours: 68.55
Today I
Riveted the HS710/714 Angles to the HS702 front spar assembly with the four AN426 (Countersunk) rivets, I wasnt happy with the shop head on the -6 rivets which was called out on the plans by van’s so i removed the first one and installed all -5 rivets.

I spent ages trying to understand the attachment of the AN470 (Universal Head) Rivets, the plans call out for the center four rivets to be attached with the flush heads aft, but it doesn’t state how the universal head rivets should be orientated, i couldn’t figure out whether this means that the uni heads should be facing forwards so I left it for the day and asked the question on the Vans Airforce Forums, i’ll see what comes back before i continue
Manual Reference: HS/RIVET/S5
Hours: 1
Total Hours: 66.55
Today I
Alumiprepped, Alodined & Primed all the Ribs, Spars & Skin Internals, this is my first attempt at this method of priming and it went much better than spray can etch-primer.
Manual Reference: HS/PREP/S5
Hours: 4.5
Total Hours: 65.55
Today I
-Riveted HS609PP Spar Reinforcing Bars to the HS603PP spar channels.
-Riveted HS412PP & HS413PP Hinge brackets to Spar

-Installed Hinge Assy. on Spar with AN3-5A Bolts, AN960-10 Washers & AN365-1032 Nuts to a torque of 20-25in/lb
Manual Reference: HS/Rivet/S1-4
Hours: 3.5
Total Hours: 61.05
Today I
Finished Deburring the RH Horizontal Stabiliser (All the hole deburring is now complete)
Dimpled RH Horizontal Stabiliser skin (All Dimpling now complete)
Finished edge deburring Skins & Skeleton (All edge Deburring now complete)
Manual Reference: HS/Deburr/S2-4
Hours: 2.9
Total Hours: 57.55
Today I:
-Finished Dimpling LH Skin
-Started Hole deburring RH Skin
-Prepped & Primed HS603PP Rear Spars
Manual Reference: HS/DEBURR/S2,3
Hours: 2.3
Total Hours: 54.65
Today I:
-Continued Deburring of Skeleton
-Finished Hole Deburring Spars
-Started Hole Deburring Ribs
-Finished Hole Deburring Ribs
-Finished Hole Deburring of LH Skin
-Dimpled Skeleton
Manual Reference: HS/DEBURR/S2
Hours: 3.3
Total Hours: 52.35
Today I:
-Deburred & Primed the HS710 & HS714 Angles.

-Removed vinyl around holes on LH Skin & Deburred all external holes.
Manual Reference: HS/DEBURR/S4
Hours: 2.8
Total Hours: 49.05
Today I continued hole deburring spars, although as I am making no progress I decided to enquire about the EZ-Burr tool to see if that will be quicker than what i’m currently doing which is running the deburring tip through my fingers, which isn’t working.
Manual Reference: HS/DEBURR/S4
Hours: 0.6
Total Hours: 46.25
-Started deburring & realised I had missed final drilling a row of holes, so I had to completely assemble the LH Horizontal Stabiliser & final drill the row of holes I missed.
-Dissassembled the Horizontal Stabiliser & continued to deburr skeleton.
-Completed external hole deburring of spars, still trying to figure out a way to deburr the internal holes.
Manual Reference: HS/DEBURR/S4
Hours: 1.8
Total Hours: 45.65
Finished edge deburring of the horizontal stab skeleton
Manual Reference: HS/DEBURR/S1
Hours: 1
Total Hours: 42.35
Organised storage of fibreglass parts
Manual Reference:
Hours: 1.5
Total Hours: 43.85
Continued deburring of horizontal stab skeleton
Manual Reference: HS/PREP/S2
Hours: 0.5
Total Hours: 41.35
Had a SAAA chapter meeting and got some advice and help from fellow members
Manual Reference:
Hours: 0
Total Hours: 41.35
Touched up Missed bits on HS609PP Stiffeners
Deburred Edges and 90% of holes on RH 609PP Rear Spar
Manual Reference: HS/PREP/S2&4
Hours: 2.4
Total Hours: 40.85
Deburred and Primed HS609PP rear spar stiffener.
Manual Reference: HS/PREP/S2
Hours: 1.4
Total Hours: 38.45
Today I marked all parts & disassembled both sides of the horizontal stabilizer
Manual Reference: HS/PREP/S1
Hours: 1
Total Hours: 37.05
Today I finished the Fuselage kit inventory
Manual Reference:
Hours: 3.3
Total Hours: 36.05
Today I finished the wing inventory
Started and finished the finishing kit inventory
And started on the fuselage inventory
Manual Reference:
Hours: 6.2
Total Hours: 32.75
Today the rest of the kit arrived so i started the inventory of the wings.
Manual Reference:
Hours: 1.7
Total Hours: 26.55
Today I
-Removed the Left Hand Side skin and drilled the OB HS710 & HS714 Holes
Started Right Hand Side
-Drilled all rib to spar holes to #30 size except the HS708
-Unclecoed, Deburred holes & Re-Clecoed
-Clecoed skin on
-Enlarged HS708 holes to #21
-Slipped HS704 & 5 in place and marked holes
-Removed and fluted HS405/5
-Marked Centreline on HS404/5 flange
-Aligned flange centreline with holes and clamped in place
-Drilled aft flange of HS405 to HS603
-Drilled HS609pp to Skin attach holes
-Drilled HS405-702-710 and HS405-714-704 holes
-Match drilled all remaining holes in Skin
-Removed the Right Hand Side skin and drilled the OB HS710 & HS714 Holes
Manual Reference: HS/DRL/Stp 18-19
Hours: 3.1
Total Hours: 24.85
-I SPENT AGES TRYING TO WORK OUT THE HS405 FWD FLANGE DRILLING IN SEC D-D BUT DECIDED TO LEAVE THAT & ASSEMBLE THE HS TEMPORARILY WITH CLECOS TO GET AN IDEA OF HOW THE ASSEMBLY FITS TOGETHER.
Manual Reference: HS/DRL/Step 1-3
Hours: 1.75
Total Hours: 16.35
THE PRIMER IS NOW DRY ON THE VA146 BEARING SO I RIVETED THE HS411’S AROUND THE BEARING WITH A -5 RIVET FOR THE FIRST RIVET, BUT LIKE MANY OTHER BUILDERS I WASN’T HAPPY WITH THE SHOP HEAD SO I DRILLED IT OUT AND DID ALL THE RIVETS WITH -6. (Refer DfD-0001)

-NEXT I CLECOED THE HS411 ASSEMBLY TO THE SPAR & ENLARGED THE ATTACHMENT HOLES TO #12 SIZE.

-I THEN MARKED THE PARTSSTEPS 9, 10 & 11 COMPLETE
Manual Reference: HS/R.S/Step 9-11
Hours: 0.75
Total Hours: 17.1
-I FLUTED THE HS708 R, HS706 L&R & HS707 L&R.
-AS WE DONT KNOW THE LOCATION OF HOLES ON HS404 & 405 I WONT FLUTE THEM YET

STEP 2 COMPLETE
Manual Reference: HS/RIB/Step 2
Hours: 0.25
Total Hours: 17.35