Left Flap prep/priming

-Continued deburring of right flap
-Found a fair bit of light surface corrosion on skin edges and around holes
-Removed corrosion
-Dimpled as required 
Primed with P99 wash primer i’m trying out, didn’t come out as well as I had hoped with a fair bit of running but by the end got it figured out and hopefully I can do better next time
-Run out of time to work on the other side

Manual Reference: 7-11

InstalledRemoved
Rivets Today00
Wing Rivets286260
Fuse Rivets240
Empennage Rivets221549
Total Project Rivets5107109
Hours3
Total Hours501.5
Statistics

Taran

Back to top