RHW TIEDOWN ASSY & REAR SPAR PREP

-CUT TIEDOWN SPACERS OUT OF SUPPLIED BAR-DRILLED LIGHTNING HOLE OUT OF SPACERS


-MEASURED AND DRILLED REFERENCE POINT ON 731 TIEDOWN BAR
-CLAMPED SPACERS AND TIEDOWN BAR TO SPAR AND DRILLED ATTACH HOLES
-DRILLED COUNTERSUNK ASSY FOR PLATENUTS


-PREPPED SPACERS & TIEDOWN BAR FOR PRIMING


REAR SPAR
-FOUND SOME LIGHT CORROSION ON THE REAR SPAR CHANNEL WHEN I REMOVED THE VINYL.
-CORROSION REMOVED REFER DFD23


-MARKED & TRIMMED 707D & G AS PER DWG 38

-EDGE DEBURRED SPAR, REINFORCEMENT FORK & REINFORCEMENT PLATES
-MATCH DRILLED DOUBLER PLATES TO SPAR

-CUT OUT AILERON PUSHROD HOLE IN DOUBLER


-INSTALLED AND MATCH DRILLED REINFORCEMENT FORK AND PLATE

Manual Reference: 7-2

InstalledRemoved
Rivets Today00
Wing Rivets128834
Total Project Rivets350986
Hours4
Total Hours377
Statistics

Taran

Back to top