-ASSEMBLED THE LEADING EDGE CRADLE AS PER THE MANUAL
Manual Reference:
RIVETS – INST 0 – REM 0 WING RIVETS – INST 326 – REM 6 TOTAL PROJECT RIVETS – INST 2541 – REM 53
Hours: 1
Total Hours: 264.75