After Contacting other builders & looking at other builders logs I decided to rivet with the manufactured head forwards
I finished riveting HS710/HS714 to HS702, although i had to drive the rivets for HS714 with the gun as the squeezer wouldnt fit, but i was very happy with my first gun driven rivets.
I realized after doing those rivets that i was meant to leave the rivets out where the HS405/405 ribs attach to the spar, so i removed the four attach rivets successfully.
Next I installed both HS405 & one HS404, but I wasn’t happy with 2 of the rivets so I removed them, but one of the HS405 holes become elongated when i removed it, so i decided to leave it for the afternoon.
Manual Reference: HS/Rivet/S5-6
Hours: 2
Total Hours: 68.55



