Drilling Horizontal stab RHS

Today I
-Removed the Left Hand Side skin and drilled the OB HS710 & HS714 Holes
Started Right Hand Side
-Drilled all rib to spar holes to #30 size except the HS708
-Unclecoed, Deburred holes & Re-Clecoed
-Clecoed skin on
-Enlarged HS708 holes to #21
-Slipped HS704 & 5 in place and marked holes
-Removed and fluted HS405/5
-Marked Centreline on HS404/5 flange
-Aligned flange centreline with holes and clamped in place
-Drilled aft flange of HS405 to HS603
-Drilled HS609pp to Skin attach holes
-Drilled HS405-702-710 and HS405-714-704 holes
-Match drilled all remaining holes in Skin
-Removed the Right Hand Side skin and drilled the OB HS710 & HS714 Holes

Manual Reference: HS/DRL/Stp 18-19

Hours: 3.1

Total Hours: 24.85

Taran