TODAY I
-FINALLY PILOT DRILLED THE FWD FLANGES ON HS405

-DRILLED ALL RIB TO SPAR HOLES TO #30 SIZE EXCEPT THE HS708
-UNCLECOED, DEBURRED HOLES & RE-CLECOED
-CLECOED SKIN ON

-ENLARGED HS708 HOLES TO #21
-SLIPPED HS704 & 5 IN PLACE AND MARKED HOLES
-REMOVED AND FLUTED HS405/5
-MARKED CENTRELINE ON HS404/5 FLANGE
-ALIGNED FLANGE CENTRELINE WITH HOLES AND CLAMPED IN PLACE
-DRILLED AFT FLANGE OF HS405 TO HS603
-DRILLED HS609PP TO SKIN ATTACH HOLES
-DRILLED HS405-702-710 AND HS405-714-704 HOLES
-MATCH DRILLED ALL REMAINING HOLES IN SKIN
Manual Reference: HS/DRILL/STEP 2-14
Hours: 3.2
Total Hours: 21.75


