HORIZONTAL STABILISER – DRILLING HORIZONTAL STABILISER

TODAY I
-FINALLY PILOT DRILLED THE FWD FLANGES ON HS405


-DRILLED ALL RIB TO SPAR HOLES TO #30 SIZE EXCEPT THE HS708
-UNCLECOED, DEBURRED HOLES & RE-CLECOED
-CLECOED SKIN ON


-ENLARGED HS708 HOLES TO #21
-SLIPPED HS704 & 5 IN PLACE AND MARKED HOLES
-REMOVED AND FLUTED HS405/5
-MARKED CENTRELINE ON HS404/5 FLANGE
-ALIGNED FLANGE CENTRELINE WITH HOLES AND CLAMPED IN PLACE
-DRILLED AFT FLANGE OF HS405 TO HS603
-DRILLED HS609PP TO SKIN ATTACH HOLES
-DRILLED HS405-702-710 AND HS405-714-704 HOLES
-MATCH DRILLED ALL REMAINING HOLES IN SKIN

  

Manual Reference: HS/DRILL/STEP 2-14

Hours: 3.2

Total Hours: 21.75

Taran

Back to top