HORIZONTAL STABILISER – RIB PREPARATION

TODAY I
-NOTCHED THE AFT END OF BOTH HS404 RIBS AS PER “HS404 TRIM DETAIL” DRAWING 3
-GOT A REPLY FROM VAN’S LETTING ME KNOW THAT MY HS702 FRONT SPAR IS FINE, AND I DON’T NEED TO REPLACE IT

COMPLETED STEP 1

Manual Reference: HS/RIB/S1

Hours: 1

Total Hours: 13.4

Taran

Back to top